WELL · 42-041-32067 · DISTRICT 3

Harriman #2

Y

Brazos County · Madisonville W. (Woodbine -A-) field · Producing  · Vertical

Harriman #2 (API 42-041-32067) is a well in Brazos County operated by Wildfire Energy Operating LLC, completed September 7, 2011 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued June 25, 2011, permitted to 8,500 ft.

It was permitted by Crimson Energy Ptnrs Iii, L.L.C. and has since transferred to Wildfire Energy Operating LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Wilcox, Austin Chalk, Woodbine, Buda.

Its lease has reported 161K barrels of oil and 40.7K mcf of gas since September 2011, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Wildfire Energy Operating LLC

Permitted by Crimson Energy Ptnrs III, L.L.C.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Oct 4, 2025 · 171 permits on file · (713) 261-3871

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWildfire Energy Operating LLC
Production reportsWildfire Energy Operating LLCthrough Mar 2026
Latest permitCrimson Energy Ptnrs III, L.L.C.Jun 25, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,500
total depth, ft
1
permits on file
Jun 25, 2011
last permit issued
Sep 7, 2011
completed
161K
cumulative oil, bbl
40.7K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 7, 2011
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Harriman O-3-25917Madisonville, W. (Woodbine -A-)Wildfire Energy Operating LLC2161K40.7KSep 2011 – Jul 2026

Oil, barrels lease total

Last 12 months 5,036 · prior 12 6,379(-21%)

05001K202420252026

Gas, mcf lease total

Last 12 months 1,768 · prior 12 1,669(+6%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Crimson Energy Ptnrs III, L.L.C.Sep 2011 → Apr 2014
  2. 2Hawkwood Energy Operating, LLCMay 2014 → Mar 2022
  3. 3Wildfire Energy Operating LLCApr 2022 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
719069-99DrillCrimson Energy Ptnrs III, L.L.C.Jun 24, 2011Jun 25, 2011Aug 9, 20118,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-25917————

Formation tops

As filed on W-2/G-1. Subsea from 368 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox3,179-2,811
Austin Chalk7,166-6,798
Woodbine7,445-7,077
Buda8,068-7,700

Perforations

Perforated and open-hole intervals.

FromToType
7,5447,556Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
93,80612.251,380 S
4.58,0578.75780 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 20, 2012Oct 19, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/04132067, documented in the API reference.