WELL · 42-047-01605 · DISTRICT 4
McGill Bros. #367
Brooks County · Kelsey Deep (Zone 21-R C) field · Vertical
Mcgill Bros. #367 (API 42-047-01605) is a plugged well in Brooks County, plugged October 14, 2002, last operated by Exxon Mobil Corporation.
The RRC has issued 3 drilling permits between 1980 and 1999, permitted to 6,400 ft.
It was permitted by Exxon Corp. and has since transferred to Exxon Mobil Corporation on the wellbore schedule.
Operator of record
Permitted by Exxon Corp.; the EWA schedule now lists a different operator.
Spring, TX · P-5 Y, filed Jan 4, 2026 · 1,223 permits on file · (346) 305-8668
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Exxon Mobil Corporation |
| Production reports | none |
| Latest permit | Exxon Corp.Mar 15, 1999 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,400
- total depth, ft
- 3
- permits on file
- Mar 15, 1999
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Oct 14, 2002
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 22 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McGill Bros. O-4-9356 | Wildcat | Overton Park Oil & Gas LP | 20 | 0 | 0 | Jan 1993 – Jul 2026 |
| McGill Bros. G-4-172311 | Wildcat | Exxon Mobil Corporation | 1 | 0 | 0 | Jan 1999 – Oct 2002 |
| McGill Bros. G-4-72533 | Kelsey (K-14) | Exxon Corp. | 1 | 0 | 0 | Jan 1993 – Jan 1999 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 483234-99 | Recompletion | Exxon Corp. | Mar 11, 1999 | Mar 15, 1999 | Jan 15, 1998 | 5,807 |
| 465150-99 | Recompletion | Exxon Corp. | Jul 21, 1997 | Jul 21, 1997 | Dec 8, 1997 | 5,780 |
| 89900-99 | Other | Exxon Corp. | Aug 14, 1980 | Aug 14, 1980 | — | 6,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-72533 | — | — | — | — |
| — | — G-4-172311 | — | — | — | — |
| — | — O-4-9356 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,264 | 1,268 | Perforated |
| 2,188 | 2,195 | Perforated |
| — | 6,256 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 238 | 18.5 | — |
| 13.375 | 328 | 18.25 | 210 S |
| 13.375 | 328 | — | — |
| 8.625 | 1,519 | 12.25 | 500 S |
| 8.625 | 1,519 | — | — |
| 2.875 | 6,390 | — | — |
| 2.875 | 6,395 | 7.875 | 700 S |
| 2.875 | 6,395 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 20, 1999 | Feb 3, 1999 | Yes |
| 00 | Apr 6, 1999 | — | — |
| 00 | Mar 23, 1998 | Jan 29, 1998 | Yes |
| 00 | Jan 12, 1984 | Nov 10, 1980 | — |
| 00 | Jan 12, 1984 | Aug 16, 1977 | — |
| 00 | Jan 12, 1984 | Jan 29, 1976 | — |
| 00 | Jan 12, 1984 | Mar 6, 1967 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-047-01605 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-047-01605 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- Feb 1988
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000065025 | W-14 Disposal | Canceled May 23, 1988 | 3,000 | 2,000 | 4,264–4,527 |
MONTHLY INJECTED, BBL · H-10 · LAST 2 REPORTED MONTHS
Last 12 months 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/04701605, documented in the API reference.