WELL · 42-047-30582 · DISTRICT 4
Santa FE Ranch #36
Brooks County · Vertical
Santa FE Ranch #36 (API 42-047-30582) is a former disposal or injection well in Brooks County, last operated by Exxon Corp.; its UIC permit is no longer active.
The RRC has issued 6 drilling permits between 1977 and 1984, permitted to 10,400 ft.
Operator of record
Houston, TX · P-5 Y, filed Jan 3, 2003 · 19,549 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Exxon Corp.Sep 26, 1984 |
- 10,400
- total depth, ft
- 6
- permits on file
- Sep 26, 1984
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Santa FE Ranch G-4-116514 | Santa FE, East (Massive 1ST 2) | Shell Western E&P | 1 | 0 | 0 | Jan 1993 – Sep 2011 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 252604-99 | Recompletion | Exxon Corp. | Sep 24, 1984 | Sep 26, 1984 | — | 10,400 |
| 154108-99 | Recompletion | Exxon Corp. | Mar 23, 1982 | Mar 23, 1982 | — | 10,400 |
| 133028-99 | Recompletion | Exxon Corp. | Sep 11, 1981 | Sep 11, 1981 | — | 10,400 |
| 92296-99 | Other | Exxon Corp. | Sep 12, 1980 | Sep 12, 1980 | — | 10,400 |
| 85765-99 | Other | Exxon Corp. | Jul 3, 1980 | Jul 3, 1980 | — | 10,400 |
| 1897-99 | Drill | Exxon Corp. | Jun 28, 1977 | Jun 28, 1977 | Jun 5, 1978 | 10,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-116514 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,051 | 8,079 | Perforated |
| 9,000 | 9,006 | Perforated |
| 9,210 | 9,216 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,201 | 14.75 | 1,160 S |
| 7.625 | 9,206 | 9.875 | 800 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 11, 1985 | May 20, 1985 | — |
| 00 | Jun 4, 1985 | — | — |
| 00 | Jan 12, 1984 | Feb 9, 1982 | — |
| 00 | Jan 12, 1984 | Jun 25, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-047-30582 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-047-30582 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 120K
- bbl, all reported
- Jan 2012
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000058038 | H-1 Injection | Plugged Dec 22, 2011 | 2,000 | 2,500 | 8,051–8,079 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/04730582, documented in the API reference.