WELL · 42-047-30958 · DISTRICT 4

Santa FE Ranch #72

N

Brooks County  · Vertical

Santa FE Ranch #72 (API 42-047-30958) is a permitted well in Brooks County filed by Shell Western E&P Inc.; no completion report is on file yet.

The RRC has issued 5 drilling permits (amended twice) between 1981 and 1998, permitted to 15,300 ft.

Completion filings report 3 formation tops, including Zone Series, Massive 1st #1, 2nd Massive.

Operator of record

Shell Western E&P Inc.

Houston, TX · P-5 Y, filed Jul 7, 2000 · 2,528 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsShell Western E&P Inc.through Jul 1998
Latest permitShell Western E&P Inc.Nov 24, 1998
15,300
total depth, ft
7
permits on file
Nov 24, 1998
last permit issued
—
completed
0
cumulative oil, bbl
529K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 1999

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Santa FE Ranch G-4-170090Santa FE, South (2)Shell Western E&P Inc.104.77KJun 1998 – Dec 1999
Santa FE Ranch G-4-168068Santa FE, East (Massive 1ST 2)Shell Western E&P Inc.106.58KMar 1998 – Jan 1999
Santa FE Ranch G-4-143574Santa FE, S. (Massive 2ND)Shell Western E&P Inc.10518KJan 1993 – Jun 1998
— G-4-100206——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Jan 1995
  2. 2Shell Western E&P Inc.Mar 1998 → Jul 1998

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
481101-98RecompletionShell Western E&P Inc.Apr 7, 1999Nov 24, 1998—15,125
481101-99RecompletionShell Western E&P Inc.Nov 24, 1998Nov 24, 1998—7,300
477207-98RecompletionShell Western E&P Inc.Jul 24, 1998Jun 16, 1998Feb 26, 19987,800
477207-99RecompletionShell Western E&P Inc.Jun 16, 1998Jun 16, 1998—7,800
474008-99RecompletionShell Western E&P Inc.Mar 4, 1998Mar 4, 1998Feb 26, 19988,350
404802-99RecompletionExxon Corp.Oct 16, 1992Oct 16, 1992Oct 22, 199213,980
118302-99DrillExxon Corp.May 8, 1981May 8, 1981May 14, 198115,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-100206————
—— G-4-143574————
—— G-4-168068————
—— G-4-170090————

Formation tops

As filed on W-2/G-1. Subsea from 90 ft elevation.Download CSV →

FormationMD ftSubsea
Zone Series7,618-7,528
Massive 1ST #17,925-7,835
2ND Massive8,245-8,155

Perforations

Perforated and open-hole intervals.

FromToType
7,6667,761Perforated
7,9968,003Perforated
8,0508,054Perforated
8,0608,064Perforated
8,2528,261Perforated
8,2648,268Perforated
8,2768,278Perforated
8,2808,292Perforated
8,2928,296Perforated
8,3008,320Perforated
13,95313,980Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,33217.51,625 S
5.58,1257.8751,015 S
5.58,2209.6251,015 S
9.6259,11612.251,007 S
9.6259,11712.251,007 S
510,3529.6251,015 S
510,3539.6251,015 S
515,123——
5.5———

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 2, 1998Jul 15, 1998Yes
00Oct 5, 1998——
00Jun 17, 1998May 13, 1998Yes
00May 28, 1998——
00Jan 9, 1998Dec 8, 1997—
00Feb 22, 1993Jan 14, 1993Yes
00Jan 26, 1993——
00Jan 12, 1984Jun 18, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/04730958, documented in the API reference.