WELL · 42-047-31262 · DISTRICT 4

Scott & Hopper #45

Plugged

Brooks County · Scott & Hopper (6900) field  · Vertical

Scott & Hopper #45 (API 42-047-31262) is a plugged well in Brooks County, plugged June 2, 2009, last operated by Synergy Oil & Gas L.P..

The RRC has issued 2 drilling permits between 1983 and 1997, permitted to 7,650 ft.

It was permitted by Manti Operating Company and has since transferred to Synergy Oil & Gas L.P. on the wellbore schedule.

Operator of record

Synergy Oil & Gas L.P.

Permitted by Manti Operating Company; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Dec 9, 2011 · 17 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSynergy Oil & Gas L.P.
Production reportsManti Operating Companythrough Aug 1997
Latest permitManti Operating CompanyAug 7, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,650
total depth, ft
2
permits on file
Aug 7, 1997
last permit issued
Jun 19, 1997
completed
0
cumulative oil, bbl
215K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2009

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 19, 1997
Shut in
—
Plugged
Jun 2, 2009

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Scott & Hopper G-4-163923Scott & Hopper (6900)Synergy Oil & Gas, L.P.104.84KJun 1997 – Jun 2009
Scott & Hopper G-4-131563Scott & HopperManti Operating Company10210KJan 1993 – Jun 1997

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → May 1995
  2. 2Manti Operating CompanyJun 1995 → Aug 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
465443-99RecompletionManti Operating CompanyJul 25, 1997Aug 7, 1997Jun 13, 19976,874
196356-99DrillExxon Corp.May 19, 1983May 19, 1983—7,650

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-131563————
—— G-4-163923————

Perforations

Perforated and open-hole intervals.

FromToType
6,5076,517Perforated
6,8666,874Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,34012.251,105 S
2.8757,2457.875860 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 18, 1997Oct 23, 1997—
00Aug 25, 1997Jul 22, 1997Yes
00Aug 14, 1997——
00Oct 4, 1989Aug 14, 1989—
00Aug 23, 1989——
00Jan 12, 1984Aug 12, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/04731262, documented in the API reference.