WELL · 42-047-31262 · DISTRICT 4
Scott & Hopper #45
Brooks County · Scott & Hopper (6900) field · Vertical
Scott & Hopper #45 (API 42-047-31262) is a plugged well in Brooks County, plugged June 2, 2009, last operated by Synergy Oil & Gas L.P..
The RRC has issued 2 drilling permits between 1983 and 1997, permitted to 7,650 ft.
It was permitted by Manti Operating Company and has since transferred to Synergy Oil & Gas L.P. on the wellbore schedule.
Operator of record
Permitted by Manti Operating Company; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Dec 9, 2011 · 17 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Synergy Oil & Gas L.P. |
| Production reports | Manti Operating Companythrough Aug 1997 |
| Latest permit | Manti Operating CompanyAug 7, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,650
- total depth, ft
- 2
- permits on file
- Aug 7, 1997
- last permit issued
- Jun 19, 1997
- completed
- 0
- cumulative oil, bbl
- 215K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2009
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 19, 1997
- Shut in
- —
- Plugged
- Jun 2, 2009
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Scott & Hopper G-4-163923 | Scott & Hopper (6900) | Synergy Oil & Gas, L.P. | 1 | 0 | 4.84K | Jun 1997 – Jun 2009 |
| Scott & Hopper G-4-131563 | Scott & Hopper | Manti Operating Company | 1 | 0 | 210K | Jan 1993 – Jun 1997 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → May 1995
- 2Manti Operating CompanyJun 1995 → Aug 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 465443-99 | Recompletion | Manti Operating Company | Jul 25, 1997 | Aug 7, 1997 | Jun 13, 1997 | 6,874 |
| 196356-99 | Drill | Exxon Corp. | May 19, 1983 | May 19, 1983 | — | 7,650 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-131563 | — | — | — | — |
| — | — G-4-163923 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,507 | 6,517 | Perforated |
| 6,866 | 6,874 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,340 | 12.25 | 1,105 S |
| 2.875 | 7,245 | 7.875 | 860 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 18, 1997 | Oct 23, 1997 | — |
| 00 | Aug 25, 1997 | Jul 22, 1997 | Yes |
| 00 | Aug 14, 1997 | — | — |
| 00 | Oct 4, 1989 | Aug 14, 1989 | — |
| 00 | Aug 23, 1989 | — | — |
| 00 | Jan 12, 1984 | Aug 12, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-047-31262 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-047-31262 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/04731262, documented in the API reference.