WELL · 42-047-31635 · DISTRICT 4

Garcia 1 #38

Plugged

Brooks County · Alta Mesa East (6200) field  · Vertical

Garcia 1 #38 (API 42-047-31635) is a plugged well in Brooks County, plugged November 8, 2012, last operated by Mestena Operating L.L.C..

The RRC has issued one drilling permit (amended 3 times), issued April 6, 1993, permitted to 9,000 ft.

It was permitted by Cometra Oil And Gas, Inc. and has since transferred to Mestena Operating L.L.C. on the wellbore schedule.

Completion filings report 5 formation tops, including 6200 Sand, 6200' Sand, 5700' Sand, 6700 Sand.

Operator of record

Mestena Operating L.L.C.

Permitted by Cometra Oil and Gas, Inc.; the EWA schedule now lists a different operator.

Corpus Christ, TX · P-5 Y, filed Apr 8, 2016 · 17 permits on file · (361) 884-2191

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMestena Operating L.L.C.
Production reportsCometra Oil and Gas, Inc.through Jan 1994
Latest permitCometra Oil and Gas, Inc.Apr 6, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
4
permits on file
Apr 6, 1993
last permit issued
May 10, 1994
completed
0
cumulative oil, bbl
39.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 1993 THROUGH Nov 2012

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 10, 1994
Shut in
—
Plugged
Nov 8, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Garcia 1 G-4-151852Alta Mesa, East (6200)Mestena Operating, L.L.C.100May 1994 – Nov 2012
Garcia 1 G-4-146171Alta Mesa, East (Corvina)Cometra Oil and Gas, Inc.1039.1KJun 1993 – May 1994

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cometra Oil and Gas, Inc.Jun 1993 → Jan 1994

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
410445-96DrillCometra Oil and Gas, Inc.Jul 15, 1994Apr 6, 1993—9,000
410445-97DrillCometra Oil and Gas, Inc.Jun 28, 1993Apr 6, 1993May 18, 19939,000
410445-98DrillCometra Oil and Gas, Inc.Apr 19, 1993Apr 6, 1993—9,000
410445-99DrillCometra Oil and Gas, Inc.Apr 2, 1993Apr 6, 1993—9,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-146171————
—— G-4-151852————

Formation tops

As filed on W-2/G-1. Subsea from 256 ft elevation.Download CSV →

FormationMD ftSubsea
6200 Sand6,235-5,979
6200' Sand6,235-5,979
5700' Sand6,740-6,484
6700 Sand6,740-6,484
Corvina7,015-6,759

Perforations

Perforated and open-hole intervals.

FromToType
5,7505,780Perforated
5,7845,794Perforated
7,0207,023Perforated
7,0317,034Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,30614.751,120 S
7.6257,0709.25370 S
7.6257,0709.875370 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 1, 1995May 27, 1994—
00Dec 8, 1994——
00Sep 3, 1993Jul 19, 1993Yes
00Aug 26, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
503K
bbl, all reported
Jan 2013
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000082710H-1 InjectionPlugged Nov 30, 20122,0002,3004,650–6,420

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120122013

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/04731635, documented in the API reference.