WELL · 42-047-31638 · DISTRICT 4

Lisandro Longoria et al Gas Unit #7

Y

Brooks County · Lopez Ranch (Consolidated) field · Producing  · Sidetrack

Lisandro Longoria ET AL Gas Unit #7 (API 42-047-31638) is a permitted well in Brooks County filed by Wynn-Crosby Energy, Inc.; no completion report is on file yet.

The RRC has issued 2 drilling permits between 1993 and 1997, permitted to 18,500 ft.

It was permitted by Wynn-Crosby Energy, Inc. and has since transferred to Omta Operating LLC on the wellbore schedule.

Operator of record

Omta Operating LLC

Permitted by Wynn-Crosby Energy, Inc.; the EWA schedule now lists a different operator.

Corpus Christ, TX · P-5 Y, filed Apr 4, 2026 · (361) 774-3896

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOmta Operating LLC
Production reportsOmta Operating LLCthrough Apr 2026
Latest permitWynn-Crosby Energy, Inc.Dec 9, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

18,500
total depth, ft
2
permits on file
Dec 9, 1997
last permit issued
—
completed
0
cumulative oil, bbl
5.92M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
—
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lisandro Longoria et al Gas Unit G-4-146950Lopez Ranch (Vksbg F1)Omta Operating LLC105.92MJul 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 11,610 · prior 12 5,818(+100%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Shell Western E&P Inc.Aug 1993 → Mar 1997
  2. 2Wynn-Crosby Energy, Inc.May 1997 → Dec 1999
  3. 3Cody Energy LLCJan 2000 → Jan 2016
  4. 4Cabot Oil & Gas CorporationNov 2016 → Sep 2017
  5. 5Galilee Oil Investments LLCOct 2017 → Aug 2023
  6. 6Cal-Tex Exploratn & Prod Co LLCSep 2023 → Oct 2024
  7. 7Omta Operating LLCAug 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
471012-99Drill · sidetrackWynn-Crosby Energy, Inc.Dec 9, 1997Dec 9, 1997Oct 6, 199711,340
411225-99DrillShell Western E&P Inc.Apr 30, 1993Apr 30, 1993May 10, 199318,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-146950————

Perforations

Perforated and open-hole intervals.

FromToType
9,8549,893Perforated
9,8599,972Perforated
9,9529,972Perforated
10,02310,034Perforated
10,29010,366Perforated
10,29910,372Perforated
10,40910,415Perforated
10,40910,472Perforated
10,41810,425Perforated
10,41810,479Perforated
10,43210,442Perforated
10,45010,472Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,03017.51,296 S
9.6259,10012.251,536 S
511,3238.5833 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 19, 1999Oct 29, 1999—
00Jul 22, 1999Jul 15, 1998Yes
00Dec 22, 1993Aug 25, 1993Yes
00Dec 3, 1993Sep 27, 1993—
00Nov 1, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/04731638, documented in the API reference.