WELL · 42-047-31925 · DISTRICT 4
Chavana #2
Brooks County · Alta Mesa East (Corvina) field · Vertical
Chavana #2 (API 42-047-31925) is a plugged well in Brooks County, plugged December 11, 2007, last operated by Jamex Inc..
The RRC has issued one drilling permit (amended once), issued March 8, 2001, permitted to 9,000 ft.
It was permitted by Jamex II Ltd., L.L.P. and has since transferred to Jamex Inc. on the wellbore schedule.
Completion filings report 5 formation tops, including U. Encantada, L. Encantada, U. Salinas, L. Salinas.
Operator of record
Permitted by Jamex II Ltd., L.L.P.; the EWA schedule now lists a different operator.
Lewisville, TX · P-5 Y, filed Apr 4, 2026 · 331 permits on file · (800) 880-1552
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Jamex Inc. |
| Production reports | Jamex, Inc.through Feb 2007 |
| Latest permit | Jamex II Ltd., L.L.P.Mar 8, 2001 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,000
- total depth, ft
- 2
- permits on file
- Mar 8, 2001
- last permit issued
- Feb 4, 2002
- completed
- 0
- cumulative oil, bbl
- 54.1K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2002 THROUGH Jun 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 4, 2002
- Shut in
- —
- Plugged
- Dec 11, 2007
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Chavana G-4-188701 | Alta Mesa, East (Corvina) | Jamex, Inc. | 1 | 0 | 54.1K | Feb 2002 – Jun 2008 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Jamex II Ltd., L.L.P.Feb 2002 → Sep 2002
- 2Jamex, Inc.Oct 2002 → Feb 2007
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 506074-98 | Drill | Jamex II Ltd., L.L.P. | May 6, 2002 | Mar 8, 2001 | May 25, 2001 | 8,990 |
| 506074-99 | Drill | Jamex II Ltd., L.L.P. | Mar 5, 2001 | Mar 8, 2001 | — | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-188701 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 269 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| U. Encantada | 7,310 | -7,041 |
| L. Encantada | 7,510 | -7,241 |
| U. Salinas | 7,700 | -7,431 |
| L. Salinas | 7,780 | -7,511 |
| V-15 | 8,120 | -7,851 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,820 | 7,826 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,840 | 14.75 | 1,135 S |
| 7.625 | 7,050 | 9.875 | 215 S |
| 2.875 | 8,204 | 6.75 | 220 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 28, 2002 | May 6, 2002 | Yes |
| 00 | May 30, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-047-31925 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-047-31925 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/04731925, documented in the API reference.