WELL · 42-047-31953 · DISTRICT 4
Santa FE Ranch #8
Brooks County · Tom East (13 800) field · Vertical
Santa FE Ranch #8 (API 42-047-31953) is a plugged well in Brooks County, plugged January 18, 2017, last operated by Trinity River Energy Oper LLC.
The RRC has issued one drilling permit, issued August 29, 2001, permitted to 19,000 ft.
It was permitted by El Paso Production Oil & Gas CO. and has since transferred to Trinity River Energy Oper LLC on the wellbore schedule.
Completion filings report one formation top, including 13800 Sd.
Operator of record
Permitted by EL Paso Production Oil & Gas Co.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Dec 10, 2021 · 6 permits on file · (800) 919-3741
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Trinity River Energy Oper LLC |
| Production reports | none |
| Latest permit | EL Paso Production Oil & Gas Co.Aug 29, 2001 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 19,000
- total depth, ft
- 1
- permits on file
- Aug 29, 2001
- last permit issued
- Dec 13, 2001
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2001 THROUGH Jan 2017
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 13, 2001
- Shut in
- —
- Plugged
- Jan 18, 2017
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Santa FE Ranch G-4-187481 | Tom East (13,800) | Trinity River Energy Oper, LLC | 1 | 0 | 0 | Dec 2001 – Jan 2017 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 513122-99 | Drill | EL Paso Production Oil & Gas Co. | Aug 29, 2001 | Aug 29, 2001 | Sep 7, 2001 | 19,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-187481 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 68 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| 13800 SD | 15,260 | -15,192 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 15,950 | 16,006 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,220 | 17.5 | 1,543 S |
| 9.625 | 10,600 | 12.25 | 930 S |
| 4.5 | 16,190 | 6.5 | 619 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 14, 2002 | Feb 11, 2002 | — |
| 00 | Apr 25, 2002 | Feb 11, 2002 | Yes |
| 00 | Mar 13, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-047-31953 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-047-31953 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000092194 | W-14 Disposal | Plugged Mar 29, 2017 | 8,000 | 1,500 | 3,000–5,000 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/04731953, documented in the API reference.