WELL · 42-047-32101 · DISTRICT 4

Lopez SWD #1

WaterY

Brooks County · Rucias N. (FB E V-17) field · Injection  · Vertical

Lopez Swd #1 (API 42-047-32101) is a well in Brooks County operated by Hilcorp Energy Company, completed August 3, 2006 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued August 29, 2003, permitted to 6,200 ft.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 24.3K barrels injected in the 12 months reported through January 2026.

Operator of record

Hilcorp Energy Company

Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,453 permits on file · (713) 209-2411

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsnone
Latest permitHilcorp Energy CompanyAug 29, 2003
6,200
total depth, ft
1
permits on file
Aug 29, 2003
last permit issued
Aug 3, 2006
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2003 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 3, 2006
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lopez SWD G-4-197821Rucias, N. (FB E V-17)Hilcorp Energy Company100Nov 2003 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
535932-99DrillHilcorp Energy CompanyAug 29, 2003Aug 29, 2003Oct 2, 20036,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-197821————

Perforations

Perforated and open-hole intervals.

FromToType
5,6335,659Perforated
5,7325,738Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,77914.75795 S
75,9979.8751,080 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 3, 2007Aug 23, 2006—
00Feb 2, 2004Nov 14, 2003Yes
00Dec 4, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

24.3K
bbl, last 12 reported months
3.07M
bbl, all reported
Jan 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000093125W-14 DisposalActive4,0002,4004,800–6,100

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 24,314 · prior 12 25,307(-4%)

02K4K6K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/04732101, documented in the API reference.