WELL · 42-047-32518 · DISTRICT 4

Gloria Lopez #1

Y

Brooks County · Lopez Ranch (Consolidated) field · Producing  · Vertical

Gloria Lopez #1 (API 42-047-32518) is a well in Brooks County operated by Cimarron Engineering LLC, completed March 10, 2016 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued October 12, 2015, permitted to 14,000 ft.

It was permitted by Lighthouse Operating, Inc. and has since transferred to Cimarron Engineering LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Frio, Vicksburg, Catahoula, Miocene (undifferentiated).

No lease production has been reported under this well’s leases.

Operator of record

Cimarron Engineering LLC

Permitted by Lighthouse Operating, Inc.; the EWA schedule now lists a different operator.

Kingsville, TX · P-5 Y, filed Sep 4, 2025 · 93 permits on file · (361) 522-2053

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCimarron Engineering LLC
Production reportsCimarron Engineering, LLCthrough Jan 2026
Latest permitLighthouse Operating, Inc.Oct 12, 2015

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,000
total depth, ft
1
permits on file
Oct 12, 2015
last permit issued
Mar 10, 2016
completed
0
cumulative oil, bbl
1.19M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2016 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 10, 2016
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gloria Lopez G-4-280268Lopez Ranch (Consolidated)Cimarron Engineering, LLC101.19MMar 2016 – Jul 2026

Gas, mcf lease total

Last 12 months 3,401 · prior 12 30,511(-89%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Lighthouse Operating, Inc.Mar 2016 → Oct 2020
  2. 2Firstrike Energy CorporationNov 2020 → Dec 2023
  3. 3Cimarron Engineering, LLCJan 2024 → Jan 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
811030-99DrillLighthouse Operating, Inc.Oct 8, 2015Oct 12, 2015Nov 15, 201514,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-280268————

Formation tops

As filed on W-2/G-1. Subsea from 118 ft elevation.Download CSV →

FormationMD ftSubsea
Frio5,150-5,032
VicksburgTOP VICKSBURG8,110-7,992
VicksburgVICKSBURG N10,570-10,452
VicksburgVICKSBURG R12,190-12,072
CatahoulaCATAHOULA-ANAHUAC - INJECTION/DI——
CatahoulaCATAHOULA-FRIO - INJECTION/DISPO——
Miocene (undifferentiated)MIOCENE-LAGARTO-OAKVILLE - INJEC——
VicksburgVICKSBURG - INJECTION/DISPOSAL;——

Perforations

Perforated and open-hole intervals.

FromToType
13,20813,438Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,73217.51,650 S
9.6258,67512.251,535 S
4.513,8008.51,225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 11, 2016Mar 30, 2016Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/04732518, documented in the API reference.