WELL · 42-049-32057 · DISTRICT 7
Hathcock #1
Brown County · Brown County Regular field · Vertical
Hathcock #1 (API 42-049-32057) is a plugged well in Brown County, plugged December 6, 2022, last operated by K & W Vanpelt Company.
The RRC has issued one drilling permit, issued June 7, 1979, permitted to 2,000 ft.
It was permitted by Whitestone Oil CO. and has since transferred to K & W Vanpelt Company on the wellbore schedule.
Its lease has reported 1.02K barrels of oil and 20 mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Whitestone Oil Co.; the EWA schedule now lists a different operator.
Portage, OH · P-5 Y, filed May 29, 2025 · 2 permits on file · (325) 636-3272
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | K & W Vanpelt Company |
| Production reports | Mole Hole Prod.through Aug 2015 |
| Latest permit | Whitestone Oil Co.Jun 7, 1979 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,000
- total depth, ft
- 1
- permits on file
- Jun 7, 1979
- last permit issued
- Jul 5, 1979
- completed
- 1.02K
- cumulative oil, bbl
- 20
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 5, 1979
- Shut in
- —
- Plugged
- Dec 6, 2022
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hathcock O-8-16457 | Brown County Regular | K & W Vanpelt Company | 2 | 1.02K | 20 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hathcock, R. F.Jan 1993 → May 2001
- 2Weller ProductionJun 2001 → Jun 2001
- 3Mullin Oil & Gas LLCJan 2010 → Oct 2010
- 4Eagle Energy CorporationNov 2010 → Oct 2011
- 5Red Dog Track, Inc.Nov 2011 → Jun 2015
- 6Mole Hole Prod.Jul 2015 → Aug 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 50227-99 | Drill | Whitestone Oil Co. | Jun 7, 1979 | Jun 7, 1979 | Jun 6, 1979 | 2,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-16457 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,699 | 1,704 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 102 | 11 | 75 S |
| 2.375 | 1,730 | — | — |
| 4.5 | 1,800 | 7.875 | 230 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Sep 10, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-049-32057 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-049-32057 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/04932057, documented in the API reference.