WELL · 42-049-32159 · DISTRICT 7
Byrd O.B. A #1
Brown County · Palo Davis (Duffer) field · Vertical
Byrd O.B. A #1 (API 42-049-32159) is a plugged well in Brown County, plugged November 5, 2003, last operated by Eubank Robert B. & B. K..
The RRC has issued one drilling permit, issued October 10, 1979, permitted to 3,400 ft.
It was permitted by Cassell Oil CO. and has since transferred to Eubank Robert B. & B. K. on the wellbore schedule.
Completion filings report 2 formation tops, including Cross Cut, Duffer.
Operator of record
Permitted by Cassell Oil Co.; the EWA schedule now lists a different operator.
Spring, TX · P-5 Y, filed Jul 7, 2006 · 17 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Eubank Robert B. & B. K. |
| Production reports | none |
| Latest permit | Cassell Oil Co.Oct 10, 1979 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,400
- total depth, ft
- 1
- permits on file
- Oct 10, 1979
- last permit issued
- May 30, 1980
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 30, 1980
- Shut in
- —
- Plugged
- Nov 5, 2003
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Byrd, O.B. "A" O-8-16617 | Palo Davis (Duffer) | Eubank, Robert B. & B. K. | 1 | 0 | 0 | Jan 1993 – Dec 2003 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 60111-99 | Drill | Cassell Oil Co. | Oct 10, 1979 | Oct 10, 1979 | Oct 9, 1979 | 3,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-16617 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,528 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Cross Cut | 1,390 | 138 |
| Duffer | 3,055 | -1,527 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,390 | 3,063 | Perforated |
| 3,056 | 3,063 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 121 | 11 | 50 S |
| 2.375 | 3,058 | — | — |
| 4.5 | 3,115 | 7.875 | 105 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 4, 1986 | Dec 3, 1985 | — |
| 00 | Jan 12, 1984 | Jul 31, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-049-32159 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-049-32159 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 17.8K
- bbl, all reported
- Mar 2003
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000056514 | H-1 Injection | Plugged Nov 18, 2003 | 0 | 0 | 1,390–0 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/04932159, documented in the API reference.