WELL · 42-049-33065 · DISTRICT 7
SRC-Garms/Leatherwood 'A' #1
Brown County · Vertical
Src-Garms/Leatherwood 'A' #1 (API 42-049-33065) is a permitted well in Brown County filed by Bayou Operating Company, Inc.; no completion report is on file yet.
The RRC has issued 3 drilling permits between 1982 and 2011, permitted to 3,500 ft.
Completion filings report 3 formation tops, including Cross Cut Sand, Caddo, Duffer.
Its 2 leases have reported 1.45K barrels of oil and 13K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Abilene, TX · P-5 Y, filed Jul 4, 2026 · 37 permits on file · (325) 668-0059
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Bayou Operating Company, Inc.through Apr 2026 |
| Latest permit | Bayou Operating Company, Inc.May 17, 2011 |
- 3,500
- total depth, ft
- 3
- permits on file
- May 17, 2011
- last permit issued
- —
- completed
- 1.45K
- cumulative oil, bbl
- 13K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| SRC-Garms/Leatherwood "A" G-8-262282 | Brown County Regular | Bayou Operating Company, Inc. | 1 | 0 | 11.8K | Feb 2011 – Jul 2026 |
| SRC Garms/Leatherwood "A" O-8-19297 | Jett (Ellenburger) | Bayou Operating Company, Inc. | 2 | 1.45K | 1.14K | Jan 1993 – Mar 2012 |
Gas, mcf lease total
Last 12 months 377 · prior 12 436(-14%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1JKW Energy DivisionJan 1993 → Dec 2003
- 2Bayou Operating Company, Inc.Mar 2011 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 714699-99 | Recompletion | Bayou Operating Company, Inc. | Apr 20, 2011 | May 17, 2011 | Feb 1, 2011 | 3,395 |
| 227932-99 | Recompletion | Grand Banks Energy Company | Jan 30, 1984 | Jan 31, 1984 | — | 3,395 |
| 152211-99 | Drill | Grand Banks Energy Company | Mar 3, 1982 | Mar 3, 1982 | — | 3,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-262282 | — | — | — | — |
| — | — O-8-19297 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,612 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,816 | 2,878 | Perforated |
| 3,366 | 3,380 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 200 | 11 | 140 S |
| 2.375 | 3,374 | — | — |
| 4.5 | 3,395 | 7.875 | 360 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 24, 2012 | Sep 16, 2011 | — |
| 00 | Jan 12, 1984 | Jan 17, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-049-33065 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-049-33065 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/04933065, documented in the API reference.