WELL · 42-049-33860 · DISTRICT 7

Guthrie R.C. #4A

Y

Brown County · Brown County Regular field · NO Production  · Vertical

Guthrie R.C. #4A (API 42-049-33860) is a well in Brown County operated by Anejo Production LLC, completed September 26, 1984 and listed as no production on the RRC schedule.

The RRC has issued one drilling permit, issued December 15, 1983, permitted to 1,990 ft.

It was permitted by Rice, James D. and has since transferred to Anejo Production LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Adams Branch, Fry Sd, Caddo.

Its lease has reported 18.4K barrels of oil and 95 mcf of gas since January 1993, last reporting in July 2026. The lease carries 66 wells, so these are lease totals, not this well alone.

Operator of record

Anejo Production LLC

Permitted by Rice, James D.; the EWA schedule now lists a different operator.

Bangs, TX · P-5 Y, filed Sep 4, 2025 · (940) 704-2608

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAnejo Production LLC
Production reportsAnejo Production, LLCthrough Apr 2026
Latest permitRice, James D.Dec 15, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,990
total depth, ft
1
permits on file
Dec 15, 1983
last permit issued
Sep 26, 1984
completed
18.4K
cumulative oil, bbl
95
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 26, 1984
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 66 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Guthrie, R.C. O-8-15509Brown County RegularAnejo Production, LLC6618.4K95Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 427 · prior 12 2,295(-81%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Rice, James D.Apr 1993 → Jun 2002
  2. 2Johnson, TimJul 2007 → Apr 2008
  3. 3J & H Energy Co.May 2008 → Feb 2010
  4. 4Ziegler-Peru, Inc.Mar 2010 → Dec 2019
  5. 5Oil Projects, LLCOct 2015 → Feb 2016
  6. 6Anejo Production, LLCJan 2020 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
223793-99DrillRice, James D.Dec 13, 1983Dec 15, 1983Apr 5, 19841,990

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-15509————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Adams Branch400
Fry SD780
Caddo850

Perforations

Perforated and open-hole intervals.

FromToType
850862Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.51001150 S
5.51,5257.875100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 30, 1984Nov 2, 1984—
00Nov 17, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Mar 2014
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000102295H-1 InjectionNot activated500420850–862

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120132014

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/04933860, documented in the API reference.