WELL · 42-049-35135 · DISTRICT 7

Steel F #8F

Plugged

Brown County · Blind Hog (Cross Cut) field  · Vertical

Steel F #8F (API 42-049-35135) is a plugged well in Brown County, plugged October 2, 2017, last operated by Sandstone Services LLC.

The RRC has issued 2 drilling permits between 1989 and 2006, permitted to 1,400 ft.

It was permitted by Ames Oil and has since transferred to Sandstone Services LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Adams Branch, Cross Cut.

Its 2 leases have reported 12.5K barrels of oil and 7.69K mcf of gas since January 1993, last reporting in July 2026. The leases carry 48 wells, so these are lease totals, not this well alone.

Operator of record

Sandstone Services LLC

Permitted by Ames Oil; the EWA schedule now lists a different operator.

Graham, TX · P-5 Y, filed Jan 5, 2026 · 3 permits on file · (817) 665-9499

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSandstone Services LLC
Production reportsDMV Pipeline LLCthrough Dec 2014
Latest permitAmes OilFeb 15, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,400
total depth, ft
2
permits on file
Feb 15, 2006
last permit issued
Mar 24, 1989
completed
12.5K
cumulative oil, bbl
7.69K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 24, 1989
Shut in
—
Plugged
Oct 2, 2017

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 48 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Steel "F" O-8-27498Blind Hog (Adams Branch)Sandstone Services, LLC53.99K7.19KFeb 1995 – Jul 2026
Steel "F" O-8-25363Blind Hog (Cross Cut)Sandstone Services, LLC438.49K508Jan 1993 – Sep 2018

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sundance Resources, Inc.Jan 1993 → Apr 1999
  2. 2Sundance Systems, Inc.Aug 1995 → Aug 1995
  3. 3Ames OilMay 1999 → Jul 2013
  4. 4DMV Pipeline LLCOct 2013 → Dec 2014

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
613856-99RecompletionAmes OilFeb 8, 2006Feb 15, 2006—707
356607-99DrillFrontier Oil & Gas of Texas, IncMar 3, 1989Mar 3, 1989Mar 3, 19891,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-25363————
—— O-8-25363————
—— O-8-27498————

Formation tops

As filed on W-2/G-1. Subsea from 1,635 ft elevation.Download CSV →

FormationMD ftSubsea
Adams Branch5631,072
Cross Cut1,300335
Cross Cut1,350285

Perforations

Perforated and open-hole intervals.

FromToType
564574Perforated
1,3531,363Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510212.2530 S
4.57077.875160 S
4.51,4217.875100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 25, 2006May 11, 2006Yes
00May 17, 2006——
00Oct 9, 2000Apr 17, 1989Yes
00Jun 8, 1989Apr 17, 1989Yes
00Jun 7, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/04935135, documented in the API reference.