WELL · 42-049-35397 · DISTRICT 7
Phillips #5
Brown County · Delay (Duffer) field · Shut IN · Vertical
Phillips #5 (API 42-049-35397) is a well in Brown County operated by Texxon Resources Inc., completed July 29, 1991 and listed as shut in on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued July 10, 1991, permitted to 3,200 ft.
It was permitted by Navigators Resources, Inc. and has since transferred to Texxon Resources Inc. on the wellbore schedule.
Completion filings report one formation top, including Caddo.
Its lease has reported 20.2K barrels of oil and 11K mcf of gas since January 1993, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Navigators Resources, Inc.; the EWA schedule now lists a different operator.
Winter Park, FL · P-5 Y, filed Oct 4, 2025 · (321) 356-7578
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Texxon Resources Inc. |
| Production reports | Texxon Resources, Inc.through Oct 2019 |
| Latest permit | Navigators Resources, Inc.Jul 10, 1991 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,200
- total depth, ft
- 2
- permits on file
- Jul 10, 1991
- last permit issued
- Jul 29, 1991
- completed
- 20.2K
- cumulative oil, bbl
- 11K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 29, 1991
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Phillips O-8-21283 | Delay (Duffer) | Texxon Resources, Inc. | 5 | 20.2K | 11K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Ocean Atlantic Resources Corp.Apr 1993 → Jul 1993
- 2Texxon Resources, Inc.Jan 1994 → Oct 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 389772-98 | Drill | Navigators Resources, Inc. | Jul 18, 1991 | Jul 10, 1991 | Jul 11, 1991 | 3,200 |
| 389772-99 | Drill | Navigators Resources, Inc. | Jul 10, 1991 | Jul 10, 1991 | — | 2,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-21283 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,996 | 2,000 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 150 | 12 | 70 S |
| 4.5 | 2,900 | 7 | 290 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 3, 1992 | Oct 25, 1991 | Yes |
| 00 | Jan 2, 1992 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-049-35397 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-049-35397 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/04935397, documented in the API reference.