WELL · 42-049-35977 · DISTRICT 7

Aztec Guthrie #13

N

Brown County · Brown County Regular field  · Vertical

Aztec Guthrie #13 (API 42-049-35977) is a well in Brown County operated by Ziegler-Peru Inc., completed November 10, 2010.

The RRC has issued one drilling permit, issued June 16, 2010, permitted to 1,999 ft.

Completion filings report one formation top, including Caddo.

Its 2 leases have reported 22.9K barrels of oil and 10.5K mcf of gas since January 1993, last reporting in July 2026. The leases carry 84 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 8.64K barrels injected in the 12 months reported through March 2025.

Operator of record

Ziegler-Peru Inc.

Houston, TX · P-5 Y, filed Jul 4, 2026 · 141 permits on file · (714) 624-8157

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleZiegler-Peru Inc.
Production reportsAnejo Production, LLCthrough Apr 2026
Latest permitZiegler-Peru, Inc.Jun 16, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,999
total depth, ft
1
permits on file
Jun 16, 2010
last permit issued
Nov 10, 2010
completed
22.9K
cumulative oil, bbl
10.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 10, 2010
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 84 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Guthrie, R.C. O-8-15509Brown County RegularAnejo Production, LLC6618.4K95Jan 1993 – Jul 2026
Aztec Guthrie O-8-30564Brown County RegularZiegler-Peru, Inc.184.58K10.4KMay 2010 – Sep 2016

Oil, barrels lease total

Last 12 months 427 · prior 12 2,295(-81%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Rice, James D.Apr 1993 → Jun 2002
  2. 2Johnson, TimJul 2007 → Apr 2008
  3. 3J & H Energy Co.May 2008 → Feb 2010
  4. 4Ziegler-Peru, Inc.Mar 2010 → Dec 2019
  5. 5Aztec Drilling & Operating, LLCOct 2011 → Jul 2015
  6. 6Oil Projects, LLCOct 2015 → Feb 2016
  7. 7Anejo Production, LLCJan 2020 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
697488-99DrillZiegler-Peru, Inc.Jun 11, 2010Jun 16, 2010Jul 10, 20101,999

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-15509————
—— O-8-30564————

Formation tops

As filed on W-2/G-1. Subsea from 1,475 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo850625

Perforations

Perforated and open-hole intervals.

FromToType
850862Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,4516.75260 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 21, 2021Dec 17, 2020—
00Aug 2, 2016Nov 19, 2010Yes
00Feb 10, 2011Nov 19, 2010Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

8.64K
bbl, last 12 reported months
82K
bbl, all reported
Mar 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000118496H-1 InjectionActive300420850–862

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 8,637 · prior 12 29,544(-71%)

02K4K6K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/04935977, documented in the API reference.