WELL · 42-049-36146 · DISTRICT 7
Einstein Medical School B #9
Brown County · Brown County Regular field · Producing · Vertical
Einstein Medical School B #9 (API 42-049-36146) is a well in Brown County operated by Paragon Oil & Gas LLC, completed April 5, 2014 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued January 22, 2014, permitted to 2,000 ft.
Completion filings report 9 formation tops, including Strawn, Caddo, Coleman Junction, Fry - Disposal.
Its lease has reported 138K barrels of oil and 26.5K mcf of gas since April 2013, last reporting in July 2026. The lease carries 6 wells, so these are lease totals, not this well alone.
Operator of record
Aledo, TX · P-5 Y, filed Apr 4, 2026 · 37 permits on file · (817) 992-7403
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Paragon Oil & Gas LLC |
| Production reports | Paragon Oil & Gas, LLCthrough Apr 2026 |
| Latest permit | Paragon Oil & Gas, LLCJan 22, 2014 |
- 2,000
- total depth, ft
- 1
- permits on file
- Jan 22, 2014
- last permit issued
- Apr 5, 2014
- completed
- 138K
- cumulative oil, bbl
- 26.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2013 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 5, 2014
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 6 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Einstein Medical School "B" O-8-31251 | Brown County Regular | Paragon Oil & Gas, LLC | 6 | 138K | 26.5K | Apr 2013 – Jul 2026 |
Oil, barrels lease total
Last 12 months 5,203 · prior 12 6,180(-16%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Paragon Oil & Gas, LLCMay 2013 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 776913-99 | Drill | Paragon Oil & Gas, LLC | Jan 8, 2014 | Jan 22, 2014 | Feb 18, 2014 | 2,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-31251 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,473 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| StrawnSTRAWN - DISPOSAL | 890 | 583 |
| CaddoCADDO - DISPOSAL | 1,020 | 453 |
| Coleman Junction | 1,040 | 433 |
| Fry - Disposal | 1,140 | 333 |
| Breneke - Disposal | 1,160 | 313 |
| Crosscut - Disposal | 1,380 | 93 |
| Unidentified-County Regular - DI | 1,440 | 33 |
| Ellenburger | — | — |
| Marble FallsMARBLE FALLS - DISPOSAL | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,836 | 1,854 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 213 | 12.25 | 145 S |
| 4.5 | 1,961 | 7.875 | 170 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 12, 2014 | Jun 10, 2014 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-049-36146 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-049-36146 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/04936146, documented in the API reference.