WELL · 42-049-36160 · DISTRICT 7
Newman #6
Brown County · Brown County Regular field · Producing · Vertical
Newman #6 (API 42-049-36160) is a well in Brown County operated by 4 J S Production, completed August 8, 2014 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued July 24, 2014, permitted to 1,999 ft.
Completion filings report 9 formation tops, including Marble Falls, Breneke - Disposal, Caddo, Coleman Junction.
Its lease has reported 11.9K barrels of oil and 24.5K mcf of gas since February 2006, last reporting in July 2026. The lease carries 6 wells, so these are lease totals, not this well alone.
Operator of record
Zephyr, TX · P-5 Y, filed Aug 4, 2025 · 20 permits on file · (325) 200-2826
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | 4 J S Production |
| Production reports | 4 J's Productionthrough Apr 2026 |
| Latest permit | 4 J's ProductionJul 24, 2014 |
- 1,999
- total depth, ft
- 1
- permits on file
- Jul 24, 2014
- last permit issued
- Aug 8, 2014
- completed
- 11.9K
- cumulative oil, bbl
- 24.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2006 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Aug 8, 2014
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 6 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Newman O-8-29692 | Brown County Regular | 4 J's Production | 6 | 11.9K | 24.5K | Feb 2006 – Jul 2026 |
Oil, barrels lease total
Last 12 months 155 · prior 12 194(-20%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Couch, GilbertFeb 2006 → Jul 2013
- 24 J's ProductionAug 2013 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 789876-99 | Drill | 4 J's Production | Jun 18, 2014 | Jul 24, 2014 | Aug 1, 2014 | 1,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-29692 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,358 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Marble FallsMARBLE FALLS - DISPOSAL | 1,630 | -272 |
| Breneke - Disposal | — | — |
| CaddoCADDO - DISPOSAL | — | — |
| Coleman Junction | — | — |
| Crosscut - Disposal | — | — |
| Ellenburger | — | — |
| Fry - Disposal | — | — |
| StrawnSTRAWN - DISPOSAL | — | — |
| Unidentified-County Regular - DI | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,626 | 1,656 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 5.5 | 1,626 | 7.875 | 345 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 4, 2015 | Oct 23, 2014 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-049-36160 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-049-36160 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/04936160, documented in the API reference.