WELL · 42-051-30468 · DISTRICT 3
Sanders L. J. A #1
Burleson County · Willard (Navarro) field · Vertical
Sanders L. J. A #1 (API 42-051-30468) is a plugged well in Burleson County, plugged August 1, 2000, last operated by Royal Hot Oil Service Inc..
The RRC has issued one drilling permit, issued October 11, 1979, permitted to 6,939 ft.
It was permitted by Texas Gas Exploration Corp. and has since transferred to Royal Hot Oil Service Inc. on the wellbore schedule.
Completion filings report 6 formation tops, including Navarro, Eagle Ford, Pecan Gap, Austin Chalk.
Its lease has reported 727 barrels of oil and 18 mcf of gas since January 1993, last reporting in July 2026.
Operator of record
Permitted by Texas Gas Exploration Corp.; the EWA schedule now lists a different operator.
Caldwell, TX · P-5 Y, filed Dec 3, 1999
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Royal Hot Oil Service Inc. |
| Production reports | Royal Hot Oil Service, Inc.through Dec 1995 |
| Latest permit | Texas Gas Exploration Corp.Oct 11, 1979 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,939
- total depth, ft
- 1
- permits on file
- Oct 11, 1979
- last permit issued
- —
- completed
- 727
- cumulative oil, bbl
- 18
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Aug 1, 2000
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sanders, L. J. "A" O-3-13277 | Willard (Navarro) | Royal Hot Oil Service, Inc. | 1 | 727 | 18 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Royal Hot Oil Service, Inc.Feb 1994 → Dec 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 60250-99 | Drill | Texas Gas Exploration Corp. | Oct 11, 1979 | Oct 11, 1979 | — | 6,939 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-13277 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 500 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Navarro | 3,940 | -3,440 |
| Eagle Ford | 4,350 | -3,850 |
| Pecan Gap | 5,300 | -4,800 |
| Austin Chalk | 5,950 | -5,450 |
| Buda | 6,840 | -6,340 |
| Del Rio | 6,930 | -6,430 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,940 | 3,980 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,345 | 12.5 | 450 S |
| 2.875 | 3,936 | — | — |
| 7 | 5,981 | 8.75 | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 21, 1993 | Nov 9, 1993 | — |
| 00 | Oct 19, 1993 | Oct 8, 1993 | — |
| 00 | Jan 12, 1984 | Jul 30, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-051-30468 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-051-30468 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- Jan 1995
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000077638 | W-14 Disposal | Plugged Sep 18, 2000 | 1,500 | 500 | 4,350–6,760 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05130468, documented in the API reference.