WELL · 42-051-32899 · DISTRICT 3

See J.W. et al Unit #1

Plugged

Burleson County · Kurten (Buda) field  · Horizontal · Sidetrack

See J.W. ET AL Unit #1 (API 42-051-32899) is a plugged horizontal well in Burleson County, plugged March 31, 2004, last operated by Graham Royalty Ltd..

The RRC has issued 2 drilling permits between 1985 and 1988, permitted to 8,500 ft.

Completion filings report 4 formation tops, including Austin Chalk, Eagle Ford, Buda, Georgetown.

Its lease has reported 16.6K barrels of oil and 3.78K mcf of gas since January 1993, last reporting in April 2004.

Operator of record

Graham Royalty Ltd.

Covington, LA · P-5 Y, filed Apr 5, 1996 · 227 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGraham Royalty Ltd.
Production reportsRme Petroleum Companythrough Oct 2001
Latest permitGraham Royalty, Ltd.Sep 13, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,500
total depth, ft
2
permits on file
Sep 13, 1988
last permit issued
Jan 11, 1986
completed
16.6K
cumulative oil, bbl
3.78K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2004

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 11, 1986
Shut in
—
Plugged
Mar 31, 2004

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
See, J.W. Etal Unit O-3-20555Kurten (Austin Chalk)Anadarko E&P Company LP116.6K3.78KJan 1993 – Apr 2004

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Graham Royalty, Ltd.Jan 1993 → Oct 1993
  2. 2Midpar L.P.Nov 1993 → Feb 1995
  3. 3Parker & Parsley Development L.PMar 1995 → May 1996
  4. 4Costilla Petroleum CorporationJun 1996 → Jan 1997
  5. 5Costilla Energy, Inc.Feb 1997 → Mar 1999
  6. 6Petra Oleum Corp.Apr 1999 → Apr 2000
  7. 7Union Pacific Resources CompanyMay 2000 → Jan 2001
  8. 8Rme Petroleum CompanyFeb 2001 → Oct 2001

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
351189-99Recompletion · sidetrackGraham Royalty, Ltd.Sep 13, 1988Sep 13, 1988—8,500
287422-99DrillRepublic Mineral CorporationOct 15, 1985Oct 15, 1985Dec 16, 19858,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-20555————

Formation tops

As filed on W-2/G-1. Subsea from 288 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk6,684-6,396
Eagle FordEAGLEFORD SHALE6,792-6,504
BudaBUDA LIMESTONE7,171-6,883
GeorgetownGEORGETOWN LIMESTONE7,249-6,961

Perforations

Perforated and open-hole intervals.

FromToType
6,7437,634Perforated
7,1767,216Perforated
7,2667,274Perforated
7,2887,306Perforated
7,3167,326Perforated
7,3427,354Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,33012.25850 S
8.6253,24012.25450 S
5.57,4747.875444 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 8, 1989Feb 2, 1989Yes
00Oct 30, 1989——
00Oct 6, 1988Feb 3, 1986Yes
00Sep 22, 1988——
00Mar 10, 1986Feb 3, 1986Yes
00Mar 1, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05132899, documented in the API reference.