WELL · 42-051-33065 · DISTRICT 3

Giesenschlag-Hensz Unit #1

Plugged

Burleson County · Caldwell (Austin Chalk) field  · Horizontal

Giesenschlag-Hensz Unit #1 (API 42-051-33065) is a plugged horizontal well in Burleson County, plugged April 16, 2012, last operated by Silver Oak Operating LLC.

The RRC has issued one drilling permit (amended once), issued May 4, 1990, permitted to 10,794 ft.

It was permitted by Christico Petroleum Company and has since transferred to Silver Oak Operating LLC on the wellbore schedule.

Completion filings report one formation top, including Austin Chalk.

Its 2 leases have reported 10.8K barrels of oil and 269K mcf of gas since January 1993, last reporting in August 2012. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Silver Oak Operating LLC

Permitted by Christico Petroleum Company; the EWA schedule now lists a different operator.

Longview, TX · P-5 Y, filed Sep 4, 2025 · (903) 738-9684

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSilver Oak Operating LLC
Production reportsSilver Oak Operating, LLCthrough Mar 2012
Latest permitChristico Petroleum CompanyMay 4, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,794
total depth, ft
2
permits on file
May 4, 1990
last permit issued
—
completed
10.8K
cumulative oil, bbl
269K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2012

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Apr 16, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Giesenschlag-Hensz Unit G-3-180835Caldwell (Austin Chalk)Silver Oak Operating, LLC1067.7KJan 2001 – Aug 2012
Giesenschlag-Hensz Unit O-3-20784Caldwell (Austin Chalk)Silver Oak Operating, Inc.110.8K201KJan 1993 – Apr 2009

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Christico Petroleum CompanyJan 1993 → Apr 1995
  2. 2McEna Inc.May 1995 → Nov 1995
  3. 3Moon Operating, Inc.Jun 1996 → Oct 1998
  4. 4Silver Oak Operating, Inc.Nov 1998 → Oct 2009
  5. 5Silver Oak Operating, LLCNov 2009 → Mar 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
372985-98DrillChristico Petroleum CompanyAug 20, 1990May 4, 1990—10,794
372985-99DrillChristico Petroleum CompanyMay 4, 1990May 4, 1990—8,850

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-180835————
—— O-3-20784————

Formation tops

As filed on W-2/G-1. Subsea from 365 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk8,915-8,550

Perforations

Perforated and open-hole intervals.

FromToType
8,92010,794Perforated
8,92010,794Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,01514.75650 S
78,9209.875415 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 25, 2001Feb 5, 2001—
00Mar 1, 2001——
00Oct 30, 1990Jul 16, 1990Yes
00Oct 26, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05133065, documented in the API reference.