WELL · 42-051-33105 · DISTRICT 3

Cag-War Admiral #1

Plugged

Burleson County · Giddings (Austin Chalk-3) field  · Horizontal

Cag-War Admiral #1 (API 42-051-33105) is a plugged horizontal well in Burleson County, plugged June 15, 1998, last operated by Brammer Petroleum Inc..

The RRC has issued one drilling permit, issued August 24, 1990, permitted to 11,777 ft.

It was permitted by Basin Resources Corporation and has since transferred to Brammer Petroleum Inc. on the wellbore schedule.

Completion filings report one formation top, including Austin Chalk.

Its lease has reported 716 barrels of oil and 14.4K mcf of gas since January 1993, last reporting in August 1998.

Operator of record

Brammer Petroleum Inc.

Permitted by Basin Resources Corporation; the EWA schedule now lists a different operator.

Gainesville, TX · P-5 Y, filed Nov 4, 2025 · 11 permits on file · (940) 736-1165

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBrammer Petroleum Inc.
Production reportsHard Rock Exploration Co.through Mar 1998
Latest permitBasin Resources CorporationAug 24, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,777
total depth, ft
1
permits on file
Aug 24, 1990
last permit issued
Oct 11, 1990
completed
716
cumulative oil, bbl
14.4K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 1998

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 11, 1990
Shut in
—
Plugged
Jun 15, 1998

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cag-War Admiral O-3-20947Giddings (Austin Chalk-3)Brammer Petroleum, Inc.171614.4KJan 1993 – Aug 1998

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cag Petroleum Corp.Jan 1993 → Dec 1993
  2. 2Hard Rock Exploration Co.Mar 1994 → Mar 1998

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
377084-99DrillBasin Resources CorporationAug 24, 1990Aug 24, 1990Aug 31, 199011,777

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-20947————

Formation tops

As filed on W-2/G-1. Subsea from 247 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk9,836-9,589

Perforations

Perforated and open-hole intervals.

FromToType
9,97711,625Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,31212.25905 S
5.59,7747.5420 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 22, 1992Dec 27, 1990—
00Apr 8, 1991—Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05133105, documented in the API reference.