WELL · 42-051-33209 · DISTRICT 3
Sam Unit #1RE
Burleson County · Giddings (Austin Chalk-3) field · Horizontal
Sam Unit #1RE (API 42-051-33209) is a horizontal well in Burleson County operated by Rme Petroleum Company, completed April 30, 1991.
The RRC has issued 2 drilling permits (amended once) between 1991 and 2000, permitted to 12,500 ft.
Completion filings report 2 formation tops, including Pecan Gap, Austin Chalk.
Its 2 leases have reported 150K barrels of oil and 533K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Houston, TX · P-5 Y, filed Oct 5, 2018 · 512 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Rme Petroleum Company |
| Production reports | Wildfire Energy Operating LLCthrough Mar 2026 |
| Latest permit | Rme Petroleum CompanyNov 28, 2000 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,500
- total depth, ft
- 3
- permits on file
- Nov 28, 2000
- last permit issued
- Apr 30, 1991
- completed
- 150K
- cumulative oil, bbl
- 533K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 30, 1991
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sam Unit O-3-24036 | Giddings (Buda) | Wildfire Energy Operating LLC | 1 | 125K | 355K | Jan 2001 – Jul 2026 |
| Sam Unit O-3-21008 | Giddings (Austin Chalk-3) | Rme Petroleum Company | 1 | 25.4K | 178K | Jan 1993 – Sep 2001 |
Oil, barrels lease total
Last 12 months 3,258 · prior 12 5,310(-39%)
Gas, mcf lease total
Last 12 months 5,961 · prior 12 10,731(-44%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1WCS Oil and Gas CorporationJan 1993 → Jun 2000
- 2Union Pacific Resources CompanyJul 2000 → Nov 2000
- 3Rme Petroleum CompanyJan 2001 → Nov 2002
- 4Anadarko E&P Company LPDec 2002 → Dec 2012
- 5Anadarko E&P Onshore LLCJan 2013 → Jun 2017
- 6Wildhorse Resources Mngt Co, LLCJul 2017 → May 2019
- 7Chesapeake Operating, L.L.C.Jun 2019 → Feb 2023
- 8Wildfire Energy Operating LLCMar 2023 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 502380-98 | Recompletion | Rme Petroleum Company | Aug 2, 2001 | Nov 28, 2000 | Dec 16, 2000 | 10,500 |
| 502380-99 | Recompletion | Union Pacific Resources Company | Nov 28, 2000 | Nov 28, 2000 | — | 10,500 |
| 385249-99 | Drill | WCS Oil and Gas Corporation | Mar 1, 1991 | Mar 1, 1991 | Mar 19, 1991 | 12,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-21008 | — | — | — | — |
| — | — O-3-24036 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 227 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pecan Gap | 6,976 | -6,749 |
| Austin Chalk | 8,145 | -7,918 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,150 | 11,778 | Perforated |
| 8,212 | 8,412 | Perforated |
| 8,215 | 12,468 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,067 | 12.25 | 495 S |
| 7 | 8,170 | 8.75 | 390 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 20, 2001 | Aug 2, 2001 | Yes |
| 00 | Sep 5, 2001 | May 13, 1991 | Yes |
| 00 | May 28, 1991 | May 13, 1991 | Yes |
| 00 | May 22, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-051-33209 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-051-33209 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05133209, documented in the API reference.