WELL · 42-051-33267 · DISTRICT 3

Malazzo #1

N

Burleson County  · Horizontal

Malazzo #1 (API 42-051-33267) is a permitted horizontal well in Burleson County filed by Holifield Oil Company; no completion report is on file yet.

The RRC has issued 2 drilling permits (amended once) between 1991 and 2007, permitted to 9,330 ft.

Completion filings report one formation top, including Austin Chalk.

Its 2 leases have reported 1.71K barrels of oil and 114K mcf of gas since January 1993, last reporting in February 2019. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Holifield Oil Company

Giddings, TX · P-5 Y, filed Feb 5, 2010 · 19 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsHolifield Oil Companythrough Aug 2007
Latest permitHolifield Oil CompanyDec 18, 2007
9,330
total depth, ft
3
permits on file
Dec 18, 2007
last permit issued
—
completed
1.71K
cumulative oil, bbl
114K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2019

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Malazzo G-3-155934Giddings (Austin Chalk, Gas)Centex Development1090.2KOct 1995 – Feb 2019
Malazzo O-3-21249Giddings (Austin Chalk-3)Parkway Petroleum, Inc.11.71K24.3KJan 1993 – Aug 1996

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Parkway Petroleum, Inc.Jan 1993 → Jul 1997
  2. 2Holifield Oil CompanyAug 1997 → Aug 2007

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
651159-99RecompletionHolifield Oil CompanyDec 11, 2007Dec 18, 2007—9,330
390929-98DrillParkway Petroleum, Inc.Jan 24, 1992Aug 15, 1991—8,676
390929-99DrillParkway Petroleum, Inc.Aug 15, 1991Aug 15, 1991Aug 15, 19918,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-155934————
—— O-3-21249————

Formation tops

As filed on W-2/G-1. Subsea from 224 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk8,454-8,230

Perforations

Perforated and open-hole intervals.

FromToType
8,50710,930Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,05912.25400 S
78,5078.751,066 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 29, 1996Oct 16, 1995—
00Nov 13, 1995——
00Dec 2, 1991Nov 14, 1991Yes
00Nov 26, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05133267, documented in the API reference.