WELL · 42-051-33361 · DISTRICT 3

Heather #1HR

Y

Burleson County · Giddings (Austin Chalk Gas) field · Temp Abandoned  · Horizontal

Heather #1HR (API 42-051-33361) is a horizontal well in Burleson County operated by Hjh Resources LLC, completed May 6, 2006 and listed as temp abandoned on the RRC schedule.

The RRC has issued 2 drilling permits (amended twice) between 1993 and 2006, permitted to 12,000 ft.

It was permitted by Tgo Operating, LLC and has since transferred to Hjh Resources LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Woodbine, Pecan Gap, Austin Chalk, Eagle Ford.

No lease production has been reported under this well’s leases.

Operator of record

HJH Resources LLC

Permitted by Tgo Operating, LLC; the EWA schedule now lists a different operator.

Giddings, TX · P-5 Y, filed Jan 4, 2026 · (832) 808-3734

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHJH Resources LLC
Production reportsLeexus Oil LLCthrough Feb 2020
Latest permitTgo Operating, LLCApr 3, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,000
total depth, ft
4
permits on file
Apr 3, 2006
last permit issued
May 6, 2006
completed
0
cumulative oil, bbl
1.46M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 6, 2006
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Heather G-3-145058Giddings (Austin Chalk, Gas)HJH Resources LLC101.46MMar 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Reserve Production, Inc.Mar 1993 → Mar 1997
  2. 2Mineral Technologies, Inc.May 1997 → Apr 1998
  3. 3Geosouthern Energy CorporationMay 1998 → Mar 2001
  4. 4Crimson Energy Company, LCApr 2001 → Dec 2003
  5. 5Huber Energy Panhandle L.P.Jul 2004 → Jul 2004
  6. 6Tgo Operating, LLCMay 2006 → Dec 2008
  7. 7Resaca Resources, L.L.C.Mar 2009 → Jul 2011
  8. 8Leexus Oil LLCJun 2012 → Feb 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
616876-97RecompletionTgo Operating, LLCNov 14, 2007Apr 3, 2006Apr 18, 200611,600
616876-98RecompletionTgo Operating, LLCMar 27, 2007Apr 3, 2006Apr 18, 200611,600
616876-99RecompletionTgo Operating, LLCMar 31, 2006Apr 3, 2006—11,600
408426-99DrillReserve Production, Inc.Jan 25, 1993Jan 25, 1993Feb 1, 199312,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-145058————

Formation tops

As filed on W-2/G-1. Subsea from 227 ft elevation.Download CSV →

FormationMD ftSubsea
Woodbine9,800-9,573
Pecan Gap10,156-9,929
Pecan Gap10,800-10,573
Austin Chalk11,146-10,919
Eagle FordEAGLEFORD11,512-11,285

Perforations

Perforated and open-hole intervals.

FromToType
11,17514,074Perforated
11,48813,398Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6253,20012.251,258 S
5.511,1757.875231 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 1, 2008Jun 16, 2006Yes
00May 20, 1993Apr 15, 1993Yes
00May 11, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05133361, documented in the API reference.