WELL · 42-051-33435 · DISTRICT 3
Watson Mary #1
Burleson County · Hooker Creek (Navarro A) field · Vertical
Watson Mary #1 (API 42-051-33435) is a well in Burleson County operated by Bar-Mac Investments Inc., completed May 16, 1995.
The RRC has issued one drilling permit, issued June 3, 1994, permitted to 4,300 ft.
Completion filings report one formation top, including Navarro.
Its 2 leases have reported 5.12K barrels of oil and 304K mcf of gas since May 1995, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Brenham, TX · P-5 Y, filed Aug 4, 2017 · 70 permits on file · (979) 219-2586
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Bar-Mac Investments Inc. |
| Production reports | Ernest Operating Companythrough Apr 2026 |
| Latest permit | Bar-Mac Investments Inc.Jun 3, 1994 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,300
- total depth, ft
- 1
- permits on file
- Jun 3, 1994
- last permit issued
- May 16, 1995
- completed
- 5.12K
- cumulative oil, bbl
- 304K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 1995 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 16, 1995
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Watson, Mary G-3-227375 | Hooker Creek (Navarro A) | Ernest Operating Company | 1 | 0 | 124K | Mar 2007 – Jul 2026 |
| Watson, Mary O-3-22901 | Hooker Creek (Navarro A) | Bar-Mac Investments Inc. | 1 | 5.12K | 181K | May 1995 – Jun 2017 |
Gas, mcf lease total
Last 12 months 1,677 · prior 12 1,644(+2%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Bar-Mac Investments Inc.Dec 1995 → Jan 2017
- 2Ernest Operating CompanyFeb 2017 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 424542-99 | Drill | Bar-Mac Investments Inc. | Jun 3, 1994 | Jun 3, 1994 | Sep 17, 1994 | 4,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-227375 | — | — | — | — |
| — | — O-3-22901 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 303 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| NavarroNAVARRO A | 4,135 | -3,832 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,135 | 4,145 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 512 | 12.25 | 275 S |
| 5.5 | 4,413 | 7.875 | 631 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 9, 2007 | May 17, 2007 | — |
| 00 | Jun 26, 2007 | — | — |
| 00 | Apr 2, 1996 | Mar 6, 1996 | Yes |
| 00 | Mar 18, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-051-33435 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-051-33435 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05133435, documented in the API reference.