WELL · 42-051-33436 · DISTRICT 3
DRC VII #1
Burleson County · Giddings (Austin Chalk Gas) field · Horizontal
Drc Vii #1 (API 42-051-33436) is a plugged horizontal well in Burleson County, plugged April 16, 2018, last operated by Westlands Resources Corporation.
The RRC has issued one drilling permit, issued June 17, 1994, permitted to 8,500 ft.
Completion filings report one formation top, including Austin Chalk.
Its 2 leases have reported 16.7K barrels of oil and 312K mcf of gas since August 1994, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Westlands Resources Corporation
Monrovia, CA · P-5 Delinquent, filed Jun 16, 2022 · 19 permits on file · (570) 795-8809
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Westlands Resources Corporation |
| Production reports | Westlands Resources Corporationthrough Apr 2014 |
| Latest permit | Westlands Resources CorporationJun 17, 1994 |
- 8,500
- total depth, ft
- 1
- permits on file
- Jun 17, 1994
- last permit issued
- Aug 20, 1994
- completed
- 16.7K
- cumulative oil, bbl
- 312K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 1994 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 20, 1994
- Shut in
- —
- Plugged
- Apr 16, 2018
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| DRC VII O-3-22519 | Giddings (Austin Chalk-3) | Westlands Resources Corporation | 1 | 16.7K | 311K | Aug 1994 – Jul 2026 |
| DRC VII G-3-234140 | Giddings (Austin Chalk, Gas) | Westlands Resources Corporation | 1 | 0 | 1.07K | Dec 2007 – Apr 2018 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Rwa CorporationAug 1994 → Sep 1999
- 2Westlands Resources CorporationOct 1999 → Sep 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 425028-99 | Drill | Westlands Resources Corporation | Jun 17, 1994 | Jun 17, 1994 | Jun 23, 1994 | 8,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-234140 | — | — | — | — |
| — | — O-3-22519 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 255 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin Chalk | 8,394 | -8,139 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,500 | 10,145 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,548 | 14.75 | 740 S |
| 7.625 | 8,500 | 9.875 | 250 S |
| 7.625 | — | — | 950 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 7, 2008 | Jan 7, 2008 | — |
| 00 | Apr 1, 2008 | — | — |
| 00 | Oct 24, 1994 | Sep 14, 1994 | Yes |
| 00 | Oct 11, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-051-33436 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-051-33436 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05133436, documented in the API reference.