WELL · 42-055-02132 · DISTRICT 1

Central National #1D

Plugged

Caldwell County · Tenney Creek field  · Vertical

Central National #1D (API 42-055-02132) is a plugged well in Caldwell County, plugged January 7, 2020, last operated by E & C Operating LLC.

The RRC has issued one drilling permit, issued December 31, 1984, permitted to 3,150 ft.

It was permitted by Continental Gulf Corp. and has since transferred to E & C Operating LLC on the wellbore schedule.

Operator of record

E & C Operating LLC

Permitted by Continental Gulf Corp.; the EWA schedule now lists a different operator.

Austin, TX · P-5 Y, filed Dec 6, 2019 · (661) 747-4131

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleE & C Operating LLC
Production reportsnone
Latest permitContinental Gulf Corp.Dec 31, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,150
total depth, ft
1
permits on file
Dec 31, 1984
last permit issued
Mar 26, 1984
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 26, 1984
Shut in
—
Plugged
Jan 7, 2020

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Central National O-1-10157Tenney CreekE & C Operating LLC100Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
262634-99OtherContinental Gulf Corp.Dec 21, 1984Dec 31, 1984—3,150

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-10157————

Perforations

Perforated and open-hole intervals.

FromToType
2,4962,500Perforated
2,5942,598Perforated
2,6402,644Perforated
2,7082,712Perforated
2,7362,740Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.52,815——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 12, 1985Jan 11, 1985—
00Feb 7, 1985——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

108K
bbl, last 12 reported months
404K
bbl, all reported
Aug 2012
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000051518W-14 DisposalPlugged Feb 14, 20203502002,815–3,150

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 108,000 · prior 12 9,000(+1100%)

010K20K30K20112012

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05502132, documented in the API reference.