WELL · 42-055-31439 · DISTRICT 1
Callihan #1
Caldwell County · Luling-Branyon field · Vertical
Callihan #1 (API 42-055-31439) is a plugged well in Caldwell County, plugged May 23, 1995, last operated by First United Resources Inc..
The RRC has issued one drilling permit, issued May 21, 1980, permitted to 2,300 ft.
It was permitted by Summit Oil CO. and has since transferred to First United Resources Inc. on the wellbore schedule.
Operator of record
Permitted by Summit Oil Co.; the EWA schedule now lists a different operator.
Austin, TX · P-5 Inactive, filed Apr 27, 1982 · (512) 451-5715
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | First United Resources Inc. |
| Production reports | none |
| Latest permit | Summit Oil Co.May 21, 1980 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,300
- total depth, ft
- 1
- permits on file
- May 21, 1980
- last permit issued
- Jun 24, 1980
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 24, 1980
- Shut in
- —
- Plugged
- May 23, 1995
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Callihan O-1-6284 | Luling-Branyon | First United Resources, Inc. | 2 | 0 | 0 | Jan 1993 – Aug 2003 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 81960-99 | Drill | Summit Oil Co. | May 21, 1980 | May 21, 1980 | — | 2,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-6284 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 770 | 830 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 2.375 | 810 | — | — |
| 4.5 | 1,004 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Jul 18, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-055-31439 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-055-31439 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05531439, documented in the API reference.