WELL · 42-055-31610 · DISTRICT 1

Mooney Isaac -A- #4

N

Caldwell County · Dunlap field  · Vertical

Mooney Isaac -A- #4 (API 42-055-31610) is a well in Caldwell County operated by Blackmar Jim Oil Operator, completed December 4, 1980.

The RRC has issued one drilling permit, issued October 17, 1980, permitted to 2,750 ft.

It was permitted by Texas Stock Tab Inc. and has since transferred to Blackmar Jim Oil Operator on the wellbore schedule.

Its lease has reported 43.1K barrels of oil and 97.1K mcf of gas since January 1993, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.

Operator of record

Blackmar Jim Oil Operator

Permitted by Texas Stock Tab Inc.; the EWA schedule now lists a different operator.

Luling, TX · P-5 Y, filed Nov 6, 2020 · 25 permits on file · (512) 653-8022

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBlackmar Jim Oil Operator
Production reportsBBC Production Company Inc.through Apr 2026
Latest permitTexas Stock Tab Inc.Oct 17, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,750
total depth, ft
1
permits on file
Oct 17, 1980
last permit issued
Dec 4, 1980
completed
43.1K
cumulative oil, bbl
97.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 4, 1980
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mooney, Isaac O-1-6388DunlapBBC Production Company Inc.543.1K97.1KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 547 · prior 12 603(-9%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Blackmar, Jim Oil OperatorJan 1993 → Jan 2021
  2. 2Origin Production Company, Inc.Feb 2021 → Aug 2021
  3. 3BBC Production Company Inc.Sep 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
96555-99DrillTexas Stock Tab Inc.Oct 17, 1980Oct 17, 1980—2,750

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-6388————

Perforations

Perforated and open-hole intervals.

FromToType
2,2642,360Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2.3752,300——
4.52,5507.875500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 12, 1989——
00Jan 12, 1984Jan 26, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05531610, documented in the API reference.