WELL · 42-055-31924 · DISTRICT 1
Hamman #2
Caldwell County · Salt Flat West field · Producing · Vertical
Hamman #2 (API 42-055-31924) is a well in Caldwell County operated by Solutions Proj And Consult LLC, completed May 26, 1981 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued April 13, 1981, permitted to 2,900 ft.
It was permitted by Hollub, Lambert Drilling Company and has since transferred to Solutions Proj And Consult LLC on the wellbore schedule.
Its lease has reported 11.6K barrels of oil and 1.99K mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Solutions Proj and Consult LLC
Permitted by Hollub, Lambert Drilling Company; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Jun 4, 2026 · (832) 699-0325
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Solutions Proj and Consult LLC |
| Production reports | Solutions Proj and Consult, LLCthrough Mar 2026 |
| Latest permit | Hollub, Lambert Drilling CompanyApr 13, 1981 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,900
- total depth, ft
- 1
- permits on file
- Apr 13, 1981
- last permit issued
- May 26, 1981
- completed
- 11.6K
- cumulative oil, bbl
- 1.99K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 26, 1981
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hamman O-1-6824 | Salt Flat, West | Solutions Proj and Consult, LLC | 2 | 11.6K | 1.99K | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 27 · prior 12 224(-88%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hollub, Lambert Drilling CompanyJan 1993 → Jan 1994
- 2Thomas Oil & Gas CompanyFeb 1994 → Jan 1995
- 3Pickett Oil Co.Feb 1995 → Aug 2007
- 4DJ Exploration, Inc.Nov 2007 → Mar 2022
- 5Asante Operating Company, LLCAug 2022 → Oct 2024
- 6Solutions Proj and Consult, LLCNov 2024 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 115012-99 | Drill | Hollub, Lambert Drilling Company | Apr 13, 1981 | Apr 13, 1981 | — | 2,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-6824 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,600 | 2,740 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 2.375 | 2,500 | — | — |
| 5.5 | 2,843 | 7.875 | 313 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Jun 23, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-055-31924 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-055-31924 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05531924, documented in the API reference.