WELL · 42-055-32354 · DISTRICT 1
Williams J. T. #1
Caldwell County · Tenney Creek field · Vertical
Williams J. T. #1 (API 42-055-32354) is a plugged well in Caldwell County, plugged July 24, 1998, last operated by Jhc Oil & Gas Inc.
The RRC has issued one drilling permit, issued October 16, 1981, permitted to 3,000 ft.
It was permitted by B-G Operating Inc. and has since transferred to Jhc Oil & Gas Inc on the wellbore schedule.
Completion filings report 5 formation tops, including A Chalk, Buda, Del Rio, George Town.
Its lease has reported 2.31K barrels of oil since January 1993, last reporting in July 2026. The lease carries 11 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by B-G Operating Inc.; the EWA schedule now lists a different operator.
Fulshear, TX · P-5 Y, filed Apr 4, 2026 · (281) 224-2457
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | JHC Oil & Gas Inc |
| Production reports | Jupiter Energy LLCthrough Apr 2023 |
| Latest permit | B-G Operating Inc.Oct 16, 1981 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,000
- total depth, ft
- 1
- permits on file
- Oct 16, 1981
- last permit issued
- Apr 5, 1982
- completed
- 2.31K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 5, 1982
- Shut in
- —
- Plugged
- Jul 24, 1998
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 11 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Williams, J. T. O-1-7991 | Tenney Creek | JHC Oil & Gas Inc | 11 | 2.31K | 0 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1RJS Resources, IncNov 1995 → Feb 1996
- 2Cole, Frank W EngineeringMar 1997 → Aug 2000
- 3Tilmon Oil Co.Mar 2008 → Jun 2010
- 4Graystone Energy CorporationJul 2010 → Dec 2012
- 5Fortune Operating CompanyJan 2013 → Mar 2013
- 6Jupiter Energy LLCDec 2022 → Apr 2023
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 136740-99 | Drill | B-G Operating Inc. | Oct 16, 1981 | Oct 16, 1981 | — | 3,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-7991 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 412 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,045 | 3,080 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 800 | 12.25 | 560 S |
| 4.5 | 3,045 | 7.875 | 777 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 26, 1990 | Jan 3, 1986 | — |
| 00 | Mar 26, 1986 | Jan 3, 1986 | — |
| 00 | Mar 21, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-055-32354 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-055-32354 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 19.8K
- bbl, all reported
- Aug 1996
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000047509 | W-14 Disposal | Plugged Jul 31, 1998 | 600 | 200 | 3,050–3,080 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05532354, documented in the API reference.