WELL · 42-055-32438 · DISTRICT 1
Eklund, Carl H #3-H
Caldwell County · Vertical
Eklund, Carl H #3-H (API 42-055-32438) is a permitted well in Caldwell County filed by Bullock Petroleum Inc.; no completion report is on file yet.
The RRC has issued 2 drilling permits in 1981, permitted to 2,800 ft.
Its 3 leases have reported 8.27K barrels of oil and 5.6K mcf of gas since January 1993, last reporting in July 2026. The leases carry 40 wells, so these are lease totals, not this well alone.
Operator of record
Houston, TX · P-5 Y, filed Dec 15, 1988 · 55 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Jad Oil, Inc.through Apr 2026 |
| Latest permit | Bullock Petroleum Inc.Dec 23, 1981 |
- 2,800
- total depth, ft
- 2
- permits on file
- Dec 23, 1981
- last permit issued
- —
- completed
- 8.27K
- cumulative oil, bbl
- 5.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 40 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Eklund Consolidated O-1-6754 | Salt Flat | Jad Oil, Inc. | 21 | 3.52K | 1.72K | Jan 1993 – Jul 2026 |
| Eklund -K- O-1-9454 | Salt Flat | Jad Oil, Inc. | 4 | 4.61K | 3.88K | Jan 1993 – Jul 2026 |
| Eklund South O-1-19444 | Salt Flat | North American Drilling Corp | 15 | 138 | 0 | Oct 2018 – Jul 2026 |
Oil, barrels lease total
Last 12 months 105 · prior 12 236(-56%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1I W B Oil VenturesJan 1993 → Jun 1999
- 2Caltex Energy Co.Oct 1999 → Mar 2011
- 3CCR Operating, LLCApr 2011 → Jul 2011
- 4Luling O&G LLCAug 2011 → Oct 2014
- 5Jad Oil, Inc.Jul 2018 → Apr 2026
- 6North American Drilling CorpNov 2018 → Aug 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 146170-99 | Drill | Bullock Petroleum Inc. | Dec 23, 1981 | Dec 23, 1981 | — | 2,800 |
| 141754-99 | Drill | Bullock Petroleum Inc. | Nov 30, 1981 | Nov 30, 1981 | — | 2,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-6754 | — | — | — | — |
| — | — O-1-9454 | — | — | — | — |
| — | — O-1-19444 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,440 | 2,690 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 2.375 | 2,450 | — | — |
| 4.5 | 2,740 | 7.875 | 370 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 27, 2018 | Feb 19, 1982 | — |
| 00 | May 1, 2018 | Feb 19, 1982 | — |
| 00 | May 21, 1984 | Feb 19, 1982 | — |
| 00 | Mar 13, 1984 | Feb 19, 1982 | — |
| 00 | Jan 12, 1984 | Feb 19, 1982 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-055-32438 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-055-32438 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05532438, documented in the API reference.