WELL · 42-055-32452 · DISTRICT 1

Garner E. G. #7

Plugged

Caldwell County · Tenney Creek field  · Vertical

Garner E. G. #7 (API 42-055-32452) is a plugged well in Caldwell County, plugged April 11, 2023, last operated by LT Oil LLC.

The RRC has issued one drilling permit, issued November 30, 1981, permitted to 2,850 ft.

It was permitted by B-G Operating Inc. and has since transferred to LT Oil LLC on the wellbore schedule.

Its lease has reported 5.5K barrels of oil since January 1993, last reporting in July 2026. The lease carries 11 wells, so these are lease totals, not this well alone.

Operator of record

LT Oil LLC

Permitted by B-G Operating Inc.; the EWA schedule now lists a different operator.

San Marcos, TX · P-5 Y, filed Apr 4, 2026 · (512) 878-3513

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLT Oil LLC
Production reportsAlltex Operating Companythrough Dec 2017
Latest permitB-G Operating Inc.Nov 30, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,850
total depth, ft
1
permits on file
Nov 30, 1981
last permit issued
Dec 28, 1981
completed
5.5K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 28, 1981
Shut in
—
Plugged
Apr 11, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 11 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Garner, E. G. O-1-7721Tenney CreekLT Oil LLC115.5K0Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1RJS Resources, IncNov 1995 → Nov 1995
  2. 2Cole, Frank W EngineeringMar 1997 → Mar 2006
  3. 3Comanche Well Service Corp.Apr 2006 → Sep 2006
  4. 4Tilmon Oil Co.Mar 2008 → Jun 2010
  5. 5Graystone Energy CorporationJul 2010 → Dec 2012
  6. 6Fortune Operating CompanyJan 2013 → Mar 2013
  7. 7Enhanced RS, Inc.Feb 2016 → Jul 2016
  8. 8Alltex Operating CompanyAug 2017 → Dec 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
141852-99DrillB-G Operating Inc.Nov 30, 1981Nov 30, 1981—2,850

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-7721————

Perforations

Perforated and open-hole intervals.

FromToType
2,4442,578Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2.3752,200——
4.52,6377.875450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Jan 25, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05532452, documented in the API reference.