WELL · 42-055-32798 · DISTRICT 1

Livengood #10

Y

Caldwell County · Luling-Branyon field · Producing  · Vertical

Livengood #10 (API 42-055-32798) is a well in Caldwell County operated by Hidden Oaks Oil Company LLC, completed July 20, 1982 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued July 13, 1982, permitted to 2,400 ft.

It was permitted by Ball, Wesley L. and has since transferred to Hidden Oaks Oil Company LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Pecan Gap, Taylor, Austin Chalk, Eagle Ford.

Its lease has reported 27.8K barrels of oil and 109 mcf of gas since January 1993, last reporting in July 2026. The lease carries 8 wells, so these are lease totals, not this well alone.

Operator of record

Hidden Oaks Oil Company LLC

Permitted by Ball, Wesley L.; the EWA schedule now lists a different operator.

New Braunfels, TX · P-5 Y, filed Sep 4, 2025 · (802) 491-9069

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHidden Oaks Oil Company LLC
Production reportsHidden Oaks Oil Company, LLCthrough Apr 2026
Latest permitBall, Wesley L.Jul 13, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,400
total depth, ft
1
permits on file
Jul 13, 1982
last permit issued
Jul 20, 1982
completed
27.8K
cumulative oil, bbl
109
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 20, 1982
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Livengood O-1-3553Luling-BranyonHidden Oaks Oil Company, LLC827.8K109Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 611 · prior 12 663(-8%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Delray Oil, Inc.Jan 1993 → Nov 2000
  2. 2Rodenberg, Laura Oil Co.Dec 2000 → Nov 2001
  3. 3Copperhead Oil & Gas, Ltd.Dec 2001 → Jul 2016
  4. 4Red Shell IncAug 2016 → Oct 2017
  5. 5Ironrock Energy CorporationNov 2017 → Sep 2021
  6. 6Origin Production Company, Inc.Oct 2021 → Mar 2025
  7. 7Hidden Oaks Oil Company, LLCApr 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
166118-99DrillBall, Wesley L.Jul 13, 1982Jul 13, 1982Jun 14, 19822,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-3553————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Pecan Gap1,520
TaylorTAYLOR MARL1,790
Austin Chalk1,912
Eagle Ford2,173
Buda2,199

Perforations

Perforated and open-hole intervals.

FromToType
1,9121,956Perforated
2,0662,089Perforated
2,1522,170Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
5.52,2117.875380 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 30, 1993Mar 15, 1993—
00Mar 22, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05532798, documented in the API reference.