WELL · 42-055-33461 · DISTRICT 1

Noble, B. E. #7

N

Caldwell County  · Vertical

Noble, B. E. #7 (API 42-055-33461) is a former disposal or injection well in Caldwell County, last operated by Tri-City Oil Company; its UIC permit is no longer active.

The RRC has issued 2 drilling permits between 1983 and 1984, permitted to 2,600 ft.

Completion filings report 3 formation tops, including Chalk, Eagle Ford, Buda.

Its lease has reported 15.4K barrels of oil and 28 mcf of gas since January 1993, last reporting in July 2026. The lease carries 21 wells, so these are lease totals, not this well alone.

Operator of record

Tri-City Oil Company

Houston, TX · P-5 Y, filed Nov 12, 1992 · 14 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsArtemisia Energy Texas, LLCthrough Dec 2025
Latest permitTri-City Oil CompanyJun 13, 1984
2,600
total depth, ft
2
permits on file
Jun 13, 1984
last permit issued
—
completed
15.4K
cumulative oil, bbl
28
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 21 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bunch, Joe "C" O-1-1048Luling-BranyonArtemisia Energy Texas, LLC2115.4K28Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 3 · prior 12 0

01202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texas Coast Operating, Inc.Jan 1993 → Sep 1994
  2. 2Cinco-C Oil Co.Jan 1995 → Mar 1995
  3. 3E-P Oil Co. Inc.Apr 1995 → Jul 1997
  4. 4Thomas Oil & Gas CompanyAug 1997 → Jul 1998
  5. 5LTS Energy, L.P.Aug 1998 → Sep 1999
  6. 6Shefts & Shefts, Inc.Oct 1999 → Apr 2000
  7. 7E & W Oil, Inc.Jun 2002 → Jan 2020
  8. 8Artemisia Energy Texas, LLCJul 2025 → Dec 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
245345-99DrillTri-City Oil CompanyJun 13, 1984Jun 13, 1984—2,600
219176-99DrillTri-City Oil CompanyOct 28, 1983Oct 28, 1983—2,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-1048————
—— O-1-1048————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Chalk1,895
Eagle FordEAGLEFORD2,170
Buda2,190

Perforations

Perforated and open-hole intervals.

FromToType
1,9501,976Perforated
1,9762,140Perforated
2,0242,038Perforated
2,0482,074Perforated
2,0942,098Perforated
2,1082,130Perforated
2,1402,170Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
52,1907.875350 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 31, 2001Mar 7, 2001—
00Mar 26, 2001Aug 13, 1984—
00Aug 22, 1984Aug 13, 1984—
00Aug 21, 1984Aug 13, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
143K
bbl, all reported
Sep 2022
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000090639H-1 InjectionCanceled Mar 6, 20234001501,976–2,140

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

012022

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05533461, documented in the API reference.