WELL · 42-055-33756 · DISTRICT 1

Conley B #4

Y

Caldwell County · Salt Flat field · Producing  · Vertical

Conley B #4 (API 42-055-33756) is a well in Caldwell County operated by Flint Pipeline Company, completed November 2, 1989 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued December 13, 1984, permitted to 3,000 ft.

It was permitted by Barrow, William R. Interests and has since transferred to Flint Pipeline Company on the wellbore schedule.

Completion filings report 3 formation tops, including Austin Chalk, Eagle Ford, Buda.

Its lease has reported 9.78K barrels of oil and 19.1K mcf of gas since January 1993, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.

Operator of record

Flint Pipeline Company

Permitted by Barrow, William R. Interests; the EWA schedule now lists a different operator.

Kilgore, TX · P-5 Y, filed May 4, 2026 · (903) 986-0808

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFlint Pipeline Company
Production reportsFlint Pipeline Companythrough Feb 2026
Latest permitBarrow, William R. InterestsDec 13, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,000
total depth, ft
1
permits on file
Dec 13, 1984
last permit issued
Nov 2, 1989
completed
9.78K
cumulative oil, bbl
19.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 2, 1989
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Conley "B" O-1-12156Salt FlatFlint Pipeline Company59.78K19.1KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 148 · prior 12 365(-59%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Polo Petroleum, Inc.Jan 1993 → Jul 1993
  2. 2Mitchell Production, Inc.Aug 1993 → Jan 1997
  3. 3Thomas Oil & Gas CompanyFeb 1997 → Apr 2003
  4. 4LTS Energy, L.P.Aug 1998 → Nov 2006
  5. 5Shefts & Shefts, Inc.Oct 1999 → Jul 2000
  6. 6Castillo Oil Co.Dec 2006 → Feb 2007
  7. 7Castillo Oil Company LLCApr 2007 → Jul 2021
  8. 8Jupiter Energy LLCAug 2021 → Dec 2024
  9. 9Flint Pipeline CompanyJan 2025 → Feb 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
261100-99DrillBarrow, William R. InterestsDec 13, 1984Dec 13, 1984—3,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-12156————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Austin Chalk2,440
Eagle FordEAGLEFORD2,690
Buda2,710

Perforations

Perforated and open-hole intervals.

FromToType
2,4402,666Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62515012.7586 S
4.52,7507.875480 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 15, 1990Mar 2, 1990—
00Dec 12, 1988Nov 14, 1988—
00Dec 3, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05533756, documented in the API reference.