WELL · 42-055-34004 · DISTRICT 1
Ross C.P. -A- #1
Caldwell County · Luling-Branyon field · Vertical
Ross C.P. -A- #1 (API 42-055-34004) is a plugged well in Caldwell County, plugged October 20, 1999, last operated by Ginco Operating CO..
The RRC has issued one drilling permit, issued October 18, 1985, permitted to 2,400 ft.
It was permitted by Spiller, H. G. and has since transferred to Ginco Operating CO. on the wellbore schedule.
Completion filings report 4 formation tops, including Wilcox, Navarro, Austin Chalk, Buda.
Its lease has reported 391 barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026.
Operator of record
Permitted by Spiller, H. G.; the EWA schedule now lists a different operator.
San Antonio, TX · P-5 Y, filed Nov 4, 2025 · 4 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Ginco Operating Co. |
| Production reports | Ginco Operating Co.through Sep 1995 |
| Latest permit | Spiller, H. G.Oct 18, 1985 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,400
- total depth, ft
- 1
- permits on file
- Oct 18, 1985
- last permit issued
- Jan 15, 1986
- completed
- 391
- cumulative oil, bbl
- 21
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 15, 1986
- Shut in
- —
- Plugged
- Oct 20, 1999
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Ross, C.P. -A- O-1-11357 | Luling-Branyon | Ginco Operating Co. | 1 | 391 | 21 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Penrod Oil Company of Texas, IncJan 1993 → Sep 1994
- 2Mobile Production Systems, Inc.Oct 1994 → Oct 1994
- 3Ginco Operating Co.Mar 1995 → Sep 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 288346-99 | Drill | Spiller, H. G. | Oct 17, 1985 | Oct 18, 1985 | — | 2,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-11357 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
| Formation | MD ft |
|---|---|
| Wilcox | 150 |
| Navarro | 800 |
| Austin Chalk | 1,507 |
| Buda | 1,965 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,507 | 1,590 | Perforated |
| 1,632 | 1,716 | Perforated |
| 1,758 | 1,840 | Perforated |
| 1,965 | 2,049 | Perforated |
| 2,091 | 2,174 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 5.5 | 2,267 | 6.75 | 327 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 19, 1986 | Feb 19, 1986 | Yes |
| 00 | Mar 13, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-055-34004 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-055-34004 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05534004, documented in the API reference.