WELL · 42-055-34474 · DISTRICT 1
Emerson #2
Caldwell County · Buchanan field · Vertical
Emerson #2 (API 42-055-34474) is a plugged well in Caldwell County, plugged August 4, 2016, last operated by Foyoro Energy LLC.
The RRC has issued one drilling permit, issued January 5, 1990, permitted to 2,800 ft.
It was permitted by Mesquite Crude Oil Company and has since transferred to Foyoro Energy LLC on the wellbore schedule.
Completion filings report 5 formation tops, including Wilcox, Midway, Navarro, Dale Lime.
Its lease has reported 6.03K barrels of oil and 8.96K mcf of gas since January 1993, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Mesquite Crude Oil Company; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Sep 4, 2020 · (281) 236-2892
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Foyoro Energy LLC |
| Production reports | Foyoro Energy, LLCthrough Apr 2013 |
| Latest permit | Mesquite Crude Oil CompanyJan 5, 1990 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,800
- total depth, ft
- 1
- permits on file
- Jan 5, 1990
- last permit issued
- Jan 17, 1990
- completed
- 6.03K
- cumulative oil, bbl
- 8.96K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 17, 1990
- Shut in
- —
- Plugged
- Aug 4, 2016
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Emerson O-1-12343 | Buchanan | Foyoro Energy, LLC | 3 | 6.03K | 8.96K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hollub, Lambert Drilling CompanyJan 1993 → Sep 1997
- 2Thomas Oil & Gas CompanyOct 1997 → Mar 2002
- 3T.O.G. Production, Inc.Aug 1998 → Dec 1998
- 4Hollub Production CompanyJan 1999 → Jul 2000
- 5Scully Energy CorporationJul 2002 → Jan 2003
- 6Origin Production Company, Inc.Mar 2006 → Jun 2006
- 7Stratco Operating Co., Inc.May 2007 → Mar 2009
- 8Chalker Operating Inc.May 2011 → Mar 2013
- 9Foyoro Energy, LLCApr 2013 → Apr 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 368323-99 | Drill | Mesquite Crude Oil Company | Jan 5, 1990 | Jan 5, 1990 | — | 2,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-12343 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 511 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,100 | 2,300 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 5.5 | 2,080 | 7.875 | 230 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 26, 1990 | Feb 12, 1990 | Yes |
| 00 | Feb 22, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-055-34474 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-055-34474 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05534474, documented in the API reference.