WELL · 42-055-34540 · DISTRICT 1

Luling Airport #7

Plugged

Caldwell County · Dunlap field  · Vertical

Luling Airport #7 (API 42-055-34540) is a plugged well in Caldwell County, plugged April 17, 2024, last operated by Origin Production Company Inc..

The RRC has issued one drilling permit, issued February 5, 1991, permitted to 2,500 ft.

It was permitted by Shale Operating CO. and has since transferred to Origin Production Company Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Austin Chalk, Eagle Ford, Buda.

Its lease has reported 24.3K barrels of oil and 80 mcf of gas since January 1993, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

Origin Production Company Inc.

Permitted by Shale Operating Co.; the EWA schedule now lists a different operator.

New Braunfels, TX · P-5 Y, filed Nov 4, 2025 · 6 permits on file · (512) 296-5926

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOrigin Production Company Inc.
Production reportsGeomeg Energy Operating Co., LLCthrough Mar 2020
Latest permitShale Operating Co.Feb 5, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,500
total depth, ft
1
permits on file
Feb 5, 1991
last permit issued
Feb 15, 1991
completed
24.3K
cumulative oil, bbl
80
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 15, 1991
Shut in
—
Plugged
Apr 17, 2024

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Luling Airport O-1-12474DunlapOrigin Production Company, Inc.324.3K80Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Shale Operating Co.Jan 1993 → Jan 1995
  2. 2Thomas Oil & Gas CompanyFeb 1995 → Mar 2003
  3. 3T.O.G. Production, Inc.Aug 1998 → Mar 1999
  4. 4Bedford Oil & Gas, Inc.Apr 2003 → Aug 2003
  5. 5Scully Energy CorporationOct 2003 → Jan 2007
  6. 6DNR Energy Company, LLCMar 2007 → Jan 2009
  7. 7Origin Production Company, Inc.Feb 2009 → Jan 2012
  8. 8Origin Prod Co Gonzales Prop LLCFeb 2012 → Apr 2012
  9. 9Geomeg Energy Operating Co., LLCMay 2012 → Mar 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
384289-99DrillShale Operating Co.Feb 5, 1991Feb 5, 1991Feb 5, 19912,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-12474————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Austin Chalk2,150
Eagle FordEAGLEFORD2,390
Buda2,405

Perforations

Perforated and open-hole intervals.

FromToType
2,1502,300Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
5.52,4477.875298 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 24, 1991Jul 15, 1991Yes
00Jul 22, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05534540, documented in the API reference.