WELL · 42-055-34692 · DISTRICT 1
Wright Gertrude #1 A
Caldwell County · Luling-Branyon field · Vertical
Wright Gertrude #1 A (API 42-055-34692) is a plugged well in Caldwell County, plugged September 11, 2000, last operated by Great Plains Resources Inc..
The RRC has issued one drilling permit, issued January 22, 1993, permitted to 2,500 ft.
It was permitted by Success Oil Company, Inc. and has since transferred to Great Plains Resources Inc. on the wellbore schedule.
Completion filings report 2 formation tops, including Astin Chalk, Eagle Ford.
Its lease has reported 5.45K barrels of oil and 26 mcf of gas since January 1993, last reporting in August 2003. The lease carries 8 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Success Oil Company, Inc.; the EWA schedule now lists a different operator.
Nixon, TX · P-5 Y, filed Mar 4, 2026
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Great Plains Resources Inc. |
| Production reports | Great Plains Resources, Inc.through Dec 1997 |
| Latest permit | Success Oil Company, Inc.Jan 22, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,500
- total depth, ft
- 1
- permits on file
- Jan 22, 1993
- last permit issued
- Feb 5, 1993
- completed
- 5.45K
- cumulative oil, bbl
- 26
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 5, 1993
- Shut in
- —
- Plugged
- Sep 11, 2000
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 8 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wright, Gertrude O-1-3604 | Luling-Branyon | Great Plains Resources, Inc. | 8 | 5.45K | 26 | Jan 1993 – Aug 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Success Oil Company, Inc.Jan 1993 → Feb 1995
- 2Ginco Operating Co.Mar 1995 → May 1996
- 3Great Plains Resources, Inc.Jul 1996 → Dec 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 408388-99 | Drill | Success Oil Company, Inc. | Jan 22, 1993 | Jan 22, 1993 | Jan 26, 1993 | 2,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-3604 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 428 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Astin Chalk | 1,940 | -1,512 |
| Eagle FordEAGLEFORD | 2,220 | -1,792 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,941 | 2,205 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 5.5 | 2,230 | 7.875 | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 10, 1993 | Jul 26, 1993 | Yes |
| 00 | Jul 28, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-055-34692 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-055-34692 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05534692, documented in the API reference.