WELL · 42-057-00071 · DISTRICT 2

Welder P. H. -B- #7

N

Calhoun County · Heyser (5400 #3) field  · Vertical

Welder P. H. -B- #7 (API 42-057-00071) is a permitted well in Calhoun County filed by Cet Energy Corporation; no completion report is on file yet.

The RRC has issued 3 drilling permits (amended once) between 1983 and 2000, permitted to 5,489 ft.

It was permitted by Cet Energy Corporation and has since transferred to Exxon Mobil Corporation on the wellbore schedule.

Completion filings report one formation top, including Frio.

Operator of record

Exxon Mobil Corporation

Permitted by Cet Energy Corporation; the EWA schedule now lists a different operator.

Spring, TX · P-5 Y, filed Jan 4, 2026 · 1,223 permits on file · (346) 305-8668

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Mobil Corporation
Production reportsXOG Operating LLCthrough Dec 2012
Latest permitCet Energy CorporationOct 25, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,489
total depth, ft
4
permits on file
Oct 25, 2000
last permit issued
—
completed
0
cumulative oil, bbl
303K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Welder, P. H. "B" G-2-181634Heyser (3400)B&L Resources, L.L.C.10303KJun 2000 – Jul 2026
Welder, P.H. -B- G-2-149157Heyser (5400 #1)Cet Energy Corporation100Jan 1994 – Jun 2000
Welder, P. H. -B- G-2-107386Heyser (5400 #2)Exxon Corp.100Jan 1993 – Jan 1994

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cet Energy CorporationJul 2000 → Jan 2003
  2. 2Xeric Oil & Gas CorporationFeb 2003 → Jun 2005
  3. 3XOG Operating LLCJul 2005 → Dec 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
499618-97RecompletionCet Energy CorporationDec 18, 2000Oct 25, 2000Jun 14, 20003,446
499618-99RecompletionCet Energy CorporationSep 14, 2000Oct 25, 2000—3,446
419570-99RecompletionExxon Corp.Dec 21, 1993Dec 21, 1993Jan 19, 19945,420
192963-99RecompletionExxon Corp.Apr 28, 1983Apr 28, 1983—5,489

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-107386————
—— G-2-149157————
—— G-2-181634————

Formation tops

As filed on W-2/G-1. Subsea from 61 ft elevation.Download CSV →

FormationMD ftSubsea
Frio4,750-4,689

Perforations

Perforated and open-hole intervals.

FromToType
3,3343,336Perforated
5,3585,370Perforated
5,4005,412Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,004—300 S
10.751,021—300 S
2.8755,204——
75,478—300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 2, 2001Jul 20, 2000Yes
00Apr 5, 2001——
00Jun 13, 1994Apr 8, 1994Yes
00May 13, 1994——
00Jan 12, 1984Oct 4, 1983—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05700071, documented in the API reference.