WELL · 42-057-00145 · DISTRICT 2

Welder P. H. -A- #19

Plugged

Calhoun County · Heyser (5400 #2) field  · Vertical

Welder P. H. -A- #19 (API 42-057-00145) is a plugged well in Calhoun County, plugged December 4, 1986, last operated by Exxon Corp..

The RRC has issued one drilling permit, issued August 24, 1977, permitted to 5,490 ft.

Operator of record

Exxon Corp.

Houston, TX · P-5 Y, filed Jan 3, 2003 · 19,549 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Corp.
Production reportsnone
Latest permitExxon Corp.Aug 24, 1977
5,490
total depth, ft
1
permits on file
Aug 24, 1977
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Dec 4, 1986

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
6087-99RecompletionExxon Corp.Aug 24, 1977Aug 24, 1977—5,490

Perforations

Perforated and open-hole intervals.

FromToType
—5,400Perforated

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Mar 1983
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000049706W-14 DisposalPlugged Jan 21, 19873,0002,5004,100–4,300

MONTHLY INJECTED, BBL · H-10 · LAST 1 REPORTED MONTHS

Last 12 months 0

01

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05700145, documented in the API reference.