WELL · 42-057-30883 · DISTRICT 2
Knipling Gas Unit #1
Calhoun County · Sheriff East (9400) field · Vertical
Knipling Gas Unit #1 (API 42-057-30883) is a plugged well in Calhoun County, plugged November 21, 2024, last operated by American Petrofina CO. Of Tex..
The RRC has issued 5 drilling permits between 1978 and 1999, permitted to 9,500 ft.
It was permitted by Synergy Oil & Gas, Inc. (A) and has since transferred to American Petrofina CO. Of Tex. on the wellbore schedule.
Completion filings report 7 formation tops, including 8530 Sd, 9000 Sand, 8800 Sand, 8800 Sd.
Operator of record
American Petrofina Co. of Tex.
Permitted by Synergy Oil & Gas, Inc. (A); the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Nov 15, 1985 · 831 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | American Petrofina Co. of Tex. |
| Production reports | XOG Operating LLCthrough Oct 2006 |
| Latest permit | Synergy Oil & Gas, Inc. (A)Dec 3, 1999 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,500
- total depth, ft
- 5
- permits on file
- Dec 3, 1999
- last permit issued
- Mar 28, 1979
- completed
- 0
- cumulative oil, bbl
- 823K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2024
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 28, 1979
- Shut in
- —
- Plugged
- Nov 21, 2024
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Knipling Gas Unit G-2-148749 | Sheriff, East (8348 Frio) | XOG Operating LLC | 1 | 0 | 697K | Jan 1994 – Oct 2024 |
| Knipling Gas Unit G-2-177933 | Sheriff, E. (8400 Frio Stringer) | XOG Operating LLC | 1 | 0 | 124K | Dec 1999 – Oct 2024 |
| Knipling Gas Unit G-2-114011 | Sheriff, East (8530) | Synergy Production Company | 1 | 0 | 1.57K | Jan 1993 – Jan 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Fina Oil & Chemical CompanyJan 1993 → Sep 1993
- 2Synergy Production CompanyOct 1993 → Jan 1996
- 3Synergy Oil & Gas, Inc. (A)Feb 1996 → Aug 2001
- 4Penn Virginia Oil & Gas Corp.Sep 2001 → Apr 2002
- 5Xeric Oil & Gas CorporationMay 2002 → Jun 2005
- 6XOG Operating LLCJul 2005 → Oct 2006
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 489944-99 | Recompletion | Synergy Oil & Gas, Inc. (A) | Dec 1, 1999 | Dec 3, 1999 | Dec 10, 1999 | 9,296 |
| 421858-99 | Recompletion | Synergy Production Company | Mar 9, 1994 | Mar 9, 1994 | Jan 27, 1994 | 9,296 |
| 247999-99 | Recompletion | American Petrofina Co. of Tex. | Aug 6, 1984 | Aug 10, 1984 | — | 9,296 |
| 187844-99 | Recompletion | American Petrofina Co. of Tex. | Mar 8, 1983 | Mar 8, 1983 | — | 9,296 |
| 38863-99 | Drill | Bell, Kelly Inc. | Dec 14, 1978 | Dec 14, 1978 | Dec 31, 1978 | 9,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-114011 | — | — | — | — |
| — | — G-2-148749 | — | — | — | — |
| — | — G-2-177933 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 17 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| 8530 SD | 8,541 | -8,524 |
| 9000 Sand | 8,710 | -8,693 |
| 8800 Sand | 8,777 | -8,760 |
| 8800 SD | 8,777 | -8,760 |
| Parcenia Oil Sand | 8,938 | -8,921 |
| Parcenia SD | 8,938 | -8,921 |
| Holloman Sand | 9,132 | -9,115 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,785 | 7,800 | Perforated |
| 8,216 | 8,224 | Perforated |
| 8,294 | 8,302 | Perforated |
| 8,314 | 8,320 | Perforated |
| 8,374 | 8,383 | Perforated |
| 8,541 | 8,546 | Perforated |
| 8,591 | 8,598 | Perforated |
| 8,910 | 8,912 | Perforated |
| 9,131 | 9,182 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,196 | 12.75 | 500 S |
| 10.75 | 2,295 | 15 | 1,000 S |
| 2 | 8,750 | — | — |
| 2.375 | 9,056 | — | — |
| 5.5 | 9,295 | 8.75 | 525 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 3, 2007 | Dec 6, 2006 | — |
| 00 | Sep 27, 2000 | Dec 30, 1999 | — |
| 00 | Aug 7, 2000 | — | — |
| 00 | Aug 22, 1994 | Mar 15, 1994 | Yes |
| 00 | Apr 13, 1994 | — | — |
| 00 | Jan 10, 1985 | Dec 13, 1984 | — |
| 00 | Dec 22, 1984 | Nov 13, 1984 | — |
| 00 | Jan 12, 1984 | Mar 28, 1983 | — |
| 00 | Jan 12, 1984 | Apr 9, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-057-30883 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-057-30883 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 123K
- bbl, all reported
- Nov 2016
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000094990 | H-1 Injection | Plugged Nov 25, 2024 | 1,000 | 1,500 | 7,550–7,800 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05730883, documented in the API reference.