WELL · 42-057-30890 · DISTRICT 2

Welder B #3

Plugged

Calhoun County · Katie Welder (G-13) field  · Vertical

Welder B #3 (API 42-057-30890) is a plugged well in Calhoun County, plugged September 20, 2004, last operated by TE-Ray Resources Inc..

The RRC has issued 2 drilling permits between 1978 and 1992, permitted to 8,700 ft.

It was permitted by American Cometra, Inc. and has since transferred to TE-Ray Resources Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including K-1, L-7, N-1.

Its 3 leases have reported 127 barrels of oil and 1.19K mcf of gas since January 1993, last reporting in February 2005. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

TE-Ray Resources Inc.

Permitted by American Cometra, Inc.; the EWA schedule now lists a different operator.

Oklahoma City, OK · P-5 Y, filed Jan 9, 2015 · 8 permits on file · (405) 250-2827

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTE-Ray Resources Inc.
Production reportsAmerican Cometra, Inc.through Apr 1993
Latest permitAmerican Cometra, Inc.Nov 24, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,700
total depth, ft
2
permits on file
Nov 24, 1992
last permit issued
Nov 24, 1992
completed
127
cumulative oil, bbl
1.19K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2005

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 24, 1992
Shut in
—
Plugged
Sep 20, 2004

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Welder B O-2-5846Heyser, SE. (6980)TE-Ray Resources, Inc.100Jan 1993 – Feb 2005
Welder "B" O-2-7867Katie Welder (G-13)TE-Ray Resources, Inc.11271.19KJan 1993 – Nov 2004
Welder B O-2-6102Heyser, SE (8080)American Cometra, Inc.100Jan 1993 – Feb 1993

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1American Cometra, Inc.Jan 1993 → Apr 1993

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
406352-99RecompletionAmerican Cometra, Inc.Nov 19, 1992Nov 24, 1992Nov 17, 19928,565
39726-99DrillParaffine Oil Corp.Dec 28, 1978Dec 28, 1978Jan 18, 19798,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-5846————
—— O-2-6102————
—— O-2-7867————

Formation tops

As filed on W-2/G-1. Subsea from 49 ft elevation.Download CSV →

FormationMD ftSubsea
K-17,610-7,561
L-77,766-7,717
N-18,081-8,032

Perforations

Perforated and open-hole intervals.

FromToType
6,2636,265Perforated
6,9766,980Perforated
8,0828,088Perforated
8,0898,091Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,52312.25625 S
27,020——
4.58,5407.875940 S
4.58,5417.875940 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 25, 1993Jan 19, 1993Yes
00Apr 26, 1993——
00Jan 12, 1984Mar 4, 1981—
00Jan 12, 1984Jan 17, 1980—
00Jan 12, 1984Mar 8, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05730890, documented in the API reference.