WELL · 42-057-31152 · DISTRICT 2

Smith, Irma May #4

N

Calhoun County  · Vertical

Smith, Irma May #4 (API 42-057-31152) is a permitted well in Calhoun County filed by Synergy Production Company; no completion report is on file yet.

The RRC has issued 5 drilling permits between 1981 and 1995, permitted to 9,366 ft.

Completion filings report 3 formation tops, including Catahoula, Greta, Frio.

Its 3 leases have reported 888 barrels of oil and 20.8K mcf of gas since January 1993, last reporting in June 2002. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Synergy Production Company

Houston, TX · P-5 Y, filed Jan 5, 1996 · 23 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsSynergy Oil & Gas, Inc. (A)through Sep 1998
Latest permitSynergy Production CompanyMar 13, 1995
9,366
total depth, ft
5
permits on file
Mar 13, 1995
last permit issued
—
completed
888
cumulative oil, bbl
20.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2002

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Smith, Irma May O-2-7830Sheriff, East (8050)Penn Virginia Oil & Gas Corp.188820.8KJan 1993 – Jun 2002
Smith, Irma May O-2-8254Sheriff, East (7800)Synergy Oil & Gas, Inc. (A)100Nov 1996 – Dec 1997
— O-2-7302——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Fina Oil & Chemical CompanyJan 1993 → Aug 1993
  2. 2Synergy Production CompanyOct 1993 → Dec 1995
  3. 3Synergy Oil & Gas, Inc. (A)Feb 1996 → Sep 1998

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
433763-99RecompletionSynergy Production CompanyMar 13, 1995Mar 13, 1995—9,350
404552-99RecompletionFina Oil & Chemical CompanyOct 12, 1992Oct 19, 1992Sep 10, 19928,200
335806-99RecompletionFina Oil & Chemical CompanySep 11, 1987Sep 17, 1987—9,366
159589-99DrillAmerican Petrofina Co. of Tex.Apr 29, 1982Apr 29, 1982—9,350
145249-99DrillAmerican Petrofina Co. of Tex.Dec 22, 1981Dec 22, 1981—9,350

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-7302————
—— O-2-7830————
—— O-2-8254————

Formation tops

As filed on W-2/G-1. Subsea from 25 ft elevation.Download CSV →

FormationMD ftSubsea
Catahoula3,945-3,920
Greta5,840-5,815
FrioFRIO, L.8,080-8,055

Perforations

Perforated and open-hole intervals.

FromToType
8,0288,038Perforated
8,1068,109Perforated
8,8918,903Perforated
8,9128,928Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,10012.25650 S
2.3758,794——
5.59,3158.751,200 S
5.59,3238.751,200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 26, 1998Jul 17, 1997—
00Jun 2, 1997——
00Dec 18, 1992Oct 23, 1992Yes
00Nov 9, 1992Oct 9, 1987Yes
00Oct 21, 1987Oct 9, 1987Yes
00Oct 15, 1987——
00Apr 17, 1985Mar 20, 1985—
00Jan 12, 1984Aug 2, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05731152, documented in the API reference.