WELL · 42-057-31375 · DISTRICT 2
State Tract 90 #5
Calhoun County · Panther Reef S.W. (Frio H-2) field · Vertical
State Tract 90 #5 (API 42-057-31375) is a plugged well in Calhoun County, plugged June 14, 2006, last operated by Neumin Production Company.
The RRC has issued 3 drilling permits between 1985 and 1995, permitted to 9,800 ft.
Completion filings report 3 formation tops, including Frio, F-4, G-1.
Operator of record
Point Comfort, TX · P-5 Delinquent, filed Aug 9, 2023 · 380 permits on file · (361) 987-7000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Neumin Production Company |
| Production reports | Neumin Production Companythrough May 2005 |
| Latest permit | Neumin Production CompanySep 18, 1995 |
- 9,800
- total depth, ft
- 3
- permits on file
- Sep 18, 1995
- last permit issued
- Aug 28, 1987
- completed
- 0
- cumulative oil, bbl
- 1.12M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2006
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 28, 1987
- Shut in
- —
- Plugged
- Jun 14, 2006
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| State Tract 90 G-2-155766 | Panther Reef, SW. (Frio E-4) | Neumin Production Company | 1 | 0 | 801K | Aug 1995 – Jun 2006 |
| State Tract 90 G-2-125370 | Panther Reef, S.W. (Frio H-2) | Neumin Production Company | 1 | 0 | 321K | Jan 1993 – Aug 1995 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Neumin Production CompanyJan 1993 → May 2005
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 439593-99 | Recompletion | Neumin Production Company | Sep 5, 1995 | Sep 18, 1995 | Aug 18, 1995 | 9,650 |
| 335417-99 | Recompletion | Neumin Production Company | Sep 2, 1987 | Sep 3, 1987 | — | 9,650 |
| 272299-99 | Drill | Neumin Production Company | Apr 8, 1985 | Apr 16, 1985 | Apr 21, 1985 | 9,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-125370 | — | — | — | — |
| — | — G-2-155766 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 22 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,662 | 8,668 | Perforated |
| 9,016 | 9,046 | Perforated |
| 9,404 | 9,410 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 20 | 135 | — | — |
| 13.375 | 1,795 | 17.5 | 1,100 S |
| 9.625 | 7,207 | 12.25 | 510 S |
| 5 | 9,638 | 8.5 | 450 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 29, 1996 | Sep 14, 1995 | Yes |
| 00 | Nov 3, 1995 | — | — |
| 00 | Nov 19, 1987 | Sep 22, 1987 | Yes |
| 00 | Oct 30, 1987 | — | — |
| 00 | Jul 9, 1985 | Jun 26, 1985 | — |
| 00 | Jul 4, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-057-31375 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-057-31375 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05731375, documented in the API reference.