WELL · 42-057-31477 · DISTRICT 2

Powderhorn Ranch #18

Plugged

Calhoun County · Powderhorn South (5200) field  · Vertical

Powderhorn Ranch #18 (API 42-057-31477) is a plugged well in Calhoun County, plugged September 24, 2021, last operated by Apache Corporation.

The RRC has issued 4 drilling permits (amended once) between 1989 and 1992, permitted to 5,600 ft.

Completion filings report 10 formation tops, including 1 Sand, 2 Sand, 3 Sand, 3 A Sand.

Operator of record

Apache Corporation

Houston, TX · P-5 Y, filed Oct 4, 2025 · 9,754 permits on file · (713) 296-6400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleApache Corporation
Production reportsnone
Latest permitApache CorporationApr 6, 1992
5,600
total depth, ft
5
permits on file
Apr 6, 1992
last permit issued
Aug 18, 1989
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2021

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 18, 1989
Shut in
—
Plugged
Sep 24, 2021

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 6 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Powderhorn Ranch G-2-141105Powderhorn (2)Bep Operating, LLC100Jan 1993 – Sep 2021
— G-2-131865——000—
— G-2-131868——000—
— G-2-134557——000—
— G-2-139743——000—
— O-2-7627——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
398031-99RecompletionApache CorporationApr 2, 1992Apr 6, 1992Mar 18, 19924,725
391818-99RecompletionApache CorporationSep 11, 1991Sep 24, 1991Aug 7, 19915,405
371578-99RecompletionApache CorporationMar 29, 1990Mar 30, 1990—5,600
360707-98DrillApache CorporationSep 11, 1989Jun 22, 1989—5,600
360707-99DrillApache CorporationJun 22, 1989Jun 22, 1989Aug 3, 19895,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-131865————
—— G-2-131868————
—— G-2-134557————
—— G-2-139743————
—— G-2-141105————
—— O-2-7627————

Formation tops

As filed on W-2/G-1. Subsea from 5 ft elevation.Download CSV →

FormationMD ftSubsea
1 Sand4,590-4,585
2 Sand4,676-4,671
2 Sand4,677-4,672
3 Sand4,762-4,757
3 a Sand4,830-4,825
3A Sand4,830-4,825
3B Sand4,960-4,955
3C Sand5,066-5,061
4 Sand5,100-5,095
4A Sand5,150-5,145
5200' Sand5,181-5,176

Perforations

Perforated and open-hole intervals.

FromToType
3,1503,250Perforated
4,6774,681Perforated
4,7664,773Perforated
4,8304,835Perforated
5,0725,076Perforated
5,1845,189Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62592313.5525 S
5.55,4008.75500 S
5.55,40018.75500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 20, 2007Aug 27, 2007—
00Jun 4, 2001Jan 26, 2001Yes
00May 14, 1992Apr 6, 1992Yes
00Apr 15, 1992——
00Jan 10, 1992Sep 11, 1991Yes
00Nov 7, 1991——
00Feb 13, 1991Mar 29, 1990Yes
00Jan 23, 1991Sep 24, 1990—
00Nov 13, 1990——
00Aug 24, 1990——
00Oct 16, 1989Sep 11, 1989Yes
00Oct 13, 1989——
00Oct 10, 1989Sep 11, 1989Yes
00Oct 5, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
7.3M
bbl, all reported
Nov 2019
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000084847W-14 DisposalPlugged Oct 27, 20216,0001,0002,100–3,250

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120182019

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05731477, documented in the API reference.